Maintenance Procedure | Lead | Document | Notes | ||||||
---|---|---|---|---|---|---|---|---|---|
Scrambler Alignment Procedure | M. Sirk & S. Jelinsky |
| |||||||
Fiber block installation Procedure | Winlight |
| Released | ||||||
Agitator Reel Removal and Fiber | M. Sirk |
| |||||||
Agitator Reel Removal Procedure | S. Gibson | Draft document in-work | |||||||
Spectrograph Installation Procedure | K. Rider |
| Outline document generated, procedure refined with 3x operations at UCB. | ||||||
Spectrograph Removal Procedure | K. Rider |
| Outline document generated, procedure refined with 3x operations at UCB. | ||||||
Chamber Pump-down Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Chamber Vent Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Shutter Replacement Procedure | S. Gibson | ||||||||
Hollow Cathode Lamp Replacement | S. Gibson | ||||||||
Cal Unit Alignment Procedure | S. Gibson & S. Halverson |
| Waiting for filter replacementupgraded filters. Will generate procedure during filter installation. | ||||||
Etalon Maintenance Procedure | C. Schwab |
| Not yet started | ||||||
Detector Cool-down Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Detector Warm-up Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
LFC Maintenance Procedure | Menlo Systems |
| A maintenance training session with Menlo is part of our contract but has not happened yet. |
...