1:00

Words from Jim

Jim

  • Thanks for efforts on 2 ToOs

  • Jim has set up 1 on 1 meetings

  • From Carolyn:

    • OAs are now doing VWA checks 10

Words from JohnJohn
    • min before opening

    • Inform observers to budget for this

  • KPIC team will be doing calibrations demos (today and on other days later this month)

  • Sherry: Is KPIC a facility instrument that we support?

    • By end of semester

    • Needs Operations Handover Review

    • Greg will be KPIC lead

    • Jim: may add KPIC as instrument to system

  • Office Space: now only have 9 offices?

    • Randy will float when CHL’s replacement arrives

    • Probably will for ~1 year

  • SA Job ad is in AAS Job Register

    • Needs 2 people for job committee

  • KSM SOC?

    • at caltech

    • Josh and Rosalie volunteered, Jim will circulate to whole group to see if someone really wants to

1:20

Instrument Leadership

Jim

OID (operations) has asked for SA help to prioritize efforts on the summit. This includes guiders.

  • Resources to work on instruments--especially to reduce faults or other lost time on-sky

  • Opportunity to demonstrate technical leadership

  • Raise internal visibility for the group

Start with LRIS: What do we want to do?

  • Does this overlap with Marc’s KNIT system? eMaint?

  • Tie tasks in KNIT to how we measure them?

  • Resources: engineer time, technician time, and OPS has $$$$

  • Focus seems to be on lost time at night as that is easily quantified

  • Guiders are a part of this

  • Percy showed draft info for LRIS

    • Had metrics for lost time (from Grant)

  • Jim: there was a CI for automated guider checks

  • Josh Walawender to tidy up KNIT board (tags for instruments)

  • Jim Lyke to talk to Marc Kassis about checking schedule, verifying instrument engineer schedule availability, and possibly making it more frequent

  • Jim: lets make sure we know what problem we’re solving with this

2:05

AO Restrictions

Jim

  • No personnel on top of or underneath either AO bench

  • OMP firm found that bench is not rated for the load we have it loaded at (about 2x)

  • There is some dead weight, but not half

2:14

Guiders at end of night

Jim for Carolyn

  • VWA at end of night includes whether guider is still exposing

    • Do we care if they are left exposing?

    • Probably doesn’t hurt anything