Time | Item | Presenter | Notes |
---|
1:00 | Words from Jim | Jim | Words from JohnJohnKPIC team will be doing calibrations demos (today and on other days later this month) Sherry: Is KPIC a facility instrument that we support? Office Space: now only have 9 offices? SA Job ad is in AAS Job Register KSM SOC?
|
1:20 | Instrument Leadership | Jim | OID (operations) has asked for SA help to prioritize efforts on the summit. This includes guiders. Resources to work on instruments--especially to reduce faults or other lost time on-sky Opportunity to demonstrate technical leadership Raise internal visibility for the group
Start with LRIS: What do we want to do? Does this overlap with Marc’s KNIT system? eMaint? Tie tasks in KNIT to how we measure them? Resources: engineer time, technician time, and OPS has $$$$ Focus seems to be on lost time at night as that is easily quantified Guiders are a part of this Percy showed draft info for LRIS Jim: there was a CI for automated guider checks Josh Walawender to tidy up KNIT board (tags for instruments) Jim Lyke to talk to Marc Kassis about checking schedule, verifying instrument engineer schedule availability, and possibly making it more frequent Jim: lets make sure we know what problem we’re solving with this
|
2:05 | AO Restrictions | Jim | No personnel on top of or underneath either AO bench OMP firm found that bench is not rated for the load we have it loaded at (about 2x) There is some dead weight, but not half
|
2:14 | Guiders at end of night | Jim for Carolyn | |
2:17 | Pau! | | |