Sub-system PDU status

...

UTStart

...

Duration (hh:mm)

...

Test

...

complet

...

05:04

...

00:15

...

Sunset/Dome open

...

05:19

...

02:00

...

PCS: fine screen, phasing

...

07:20

...

00:10

...

Switch to OSIRIS

...

07:30

...

00:30

...

Basic AO/OSIRIS checkout

Stability

IQ on bright star

...

08:00

...

01:00

...

OSIRIS HAM Check

HD 90700 (single)

HD 90823 (double)

...

09:00

...

01:00

...

OSIRIS post-service

Server functionality post OS upgrade

Orientation

Offsets between OSPEC/OSIMG

Offsets between OSPEC scales

...

10:00

...

01:00

...

OSIRIS Tellurics w/ & w/o TRICK dichroic

Mostly SPEC

Simultaneous IMAG if can

...

11:00

...

01:00

...

OSIRIS blank sky for wavelength solution

...

12:00

...

01:00

...

Repeat Tellurics or Imager throughputs as function of pupil

...

13:00

...

00:10

...

Switch to SSC

...

13:10

...

00:50

...

45-star pointing test CW

...

14:00

...

00:50

...

45-star pointing test CCW

...

14:52

...

-

...

12-degree twilight

...

15:33

...

-

...

Sunrise

2020-05-22. Night 2

...

StartUT

...

Duration

...

Test

...

complete

...

05:04

...

00:16

...

Sunset/Open Dome

...

05:20

...

01:00

...

MOSFIRE on-sky

...

06:20

...

00:10

...

Switch to OSIRIS

...

06:30

...

00:45

...

LGS checkout

...

07:15

...

01:00

...

KAPA laser optimization

Wavelength

Polarization

Intensity

Background w/ detuning

...

08:15

...

02:00

...

KAPA laser performance

Spot size vs. El

Pointing

...

10:15

...

03:00

...

KAPA LGS performance

Imag IQ vs TT Rmag, EL

SPEC IQ vs TT Rmag, EL

Ref NGS measurement

...

13:15

...

01:37

...

TRICK functionality on GC

...

14:52

...

-

...

12 degree twilight

...

15:33

...

-

...

Sunrise

 

2020-05-23. Night 3

...

StartUT

...

Duration

...

Test

...

complete

...

05:05

...

00:15

...

Sunset/Open Dome

...

05:20

...

01:00

...

HIRESr on-sky

...

06:20

...

00:10

...

Switch to OSIRIS

...

06:30

...

01:00

...

LGS checkout

...

07:30

...

01:30

...

LBWFS Tests

New LBImgAcq

New LBMngr

...

09:00

...

03:00

...

KAPA LGS Performance

IQ vs mag

IQ vs off-axis distance

IQ vs framerate

IQ vs r0

Ref NGS measurement

Dither performance

...

12:00

...

02:51

...

LIFT w/ TRICK

...

14:51

...

-

...

12 degree twilight

...

15:33

...

-

...

Sub-system PDUs (needed and/or already installed)

Sub-system

Function

Physical Location

Status

Keyword Control

CCD controller power supply

CCD control crate

Footlocker inside HIRES enclosure. Power cord goes through wall into Old K1 laser enclosure.

Image Added

PDU Installed:

PDU: KB_A1

…48G-K1Laser …82.54 port 28

needs implementation

Fan Control

Cooling for CCD controller

Footlocker in HIRES enclosure. This is part of the same power cable for the Footlocker. Single PDU connects both.

PDU Installed

(same one as footlocker):

PDU:KB_A1

…48G-K1Laser …82.54 port 28

needs implementation

Motor Control crate power supply

Motor control Crate

Old K1 laser enclosure on K1 Platform

motor-crate-pdu.jpegImage AddedIMG_9260.jpegImage Added

PDU Installed:

PDU: KB_A3

…48G-K1Laser 192.168.82.54 port 26

needs implementation

Exposure Meter

Separate system used for controlling exposure time to achieve a desired S/N

Old K1 laser enclosure on K1 Platform

Image Added

PDU Installed:

KA_A6

needs implementation

Terminal Server

For access to the motor crate

Old K1 laser enclosure on K1 Platform

IMG_9261.jpegImage Added

PDU Installed:

KA_A1

needs implementation

RS232 to Serial Converter1

Fiber to/from serial conversion

Old K1 laser enclosure on K1 Platform

IMG_9263.jpegImage Added

PDU Installed:

KA_A4

needs implementation

RS232 to Serial Converter2

Fiber to/from serial conversion

Old K1 laser enclosure on K1 Platform

IMG_9262.jpegImage Added

PDU Installed:

KA_A5

needs implementation

Ethernet Converter

10 Base 2 to/from ethernet converter

IMG_9264.jpegImage Added

PDU Installed:

KA_A3

needs implementation

HIRES server (“lehoula”)

Main computer server for the instrument

K1 computer room

IMG_9267.jpegImage AddedIMG_9266.jpegImage Added

PDU installed (Jet Dee)