Sub-system PDU status
...
UTStart
...
Duration (hh:mm)
...
Test
...
complet
...
05:04
...
00:15
...
Sunset/Dome open
...
05:19
...
02:00
...
PCS: fine screen, phasing
...
07:20
...
00:10
...
Switch to OSIRIS
...
07:30
...
00:30
...
Basic AO/OSIRIS checkout
Stability
IQ on bright star
...
08:00
...
01:00
...
OSIRIS HAM Check
HD 90700 (single)
HD 90823 (double)
...
09:00
...
01:00
...
OSIRIS post-service
Server functionality post OS upgrade
Orientation
Offsets between OSPEC/OSIMG
Offsets between OSPEC scales
...
10:00
...
01:00
...
OSIRIS Tellurics w/ & w/o TRICK dichroic
Mostly SPEC
Simultaneous IMAG if can
...
11:00
...
01:00
...
OSIRIS blank sky for wavelength solution
...
12:00
...
01:00
...
Repeat Tellurics or Imager throughputs as function of pupil
...
13:00
...
00:10
...
Switch to SSC
...
13:10
...
00:50
...
45-star pointing test CW
...
14:00
...
00:50
...
45-star pointing test CCW
...
14:52
...
-
...
12-degree twilight
...
15:33
...
-
...
Sunrise
2020-05-22. Night 2
...
StartUT
...
Duration
...
Test
...
complete
...
05:04
...
00:16
...
Sunset/Open Dome
...
05:20
...
01:00
...
MOSFIRE on-sky
...
06:20
...
00:10
...
Switch to OSIRIS
...
06:30
...
00:45
...
LGS checkout
...
07:15
...
01:00
...
KAPA laser optimization
Wavelength
Polarization
Intensity
Background w/ detuning
...
08:15
...
02:00
...
KAPA laser performance
Spot size vs. El
Pointing
...
10:15
...
03:00
...
KAPA LGS performance
Imag IQ vs TT Rmag, EL
SPEC IQ vs TT Rmag, EL
Ref NGS measurement
...
13:15
...
01:37
...
TRICK functionality on GC
...
14:52
...
-
...
12 degree twilight
...
15:33
...
-
...
Sunrise
2020-05-23. Night 3
...
StartUT
...
Duration
...
Test
...
complete
...
05:05
...
00:15
...
Sunset/Open Dome
...
05:20
...
01:00
...
HIRESr on-sky
...
06:20
...
00:10
...
Switch to OSIRIS
...
06:30
...
01:00
...
LGS checkout
...
07:30
...
01:30
...
LBWFS Tests
New LBImgAcq
New LBMngr
...
09:00
...
03:00
...
KAPA LGS Performance
IQ vs mag
IQ vs off-axis distance
IQ vs framerate
IQ vs r0
Ref NGS measurement
Dither performance
...
12:00
...
02:51
...
LIFT w/ TRICK
...
14:51
...
-
...
12 degree twilight
...
15:33
...
-
...
Sub-system PDUs (needed and/or already installed)
Sub-system | Function | Physical Location | Status | Keyword Control |
CCD controller power supply | CCD control crate | Footlocker inside HIRES enclosure. Power cord goes through wall into Old K1 laser enclosure. | PDU Installed: PDU: KB_A1 …48G-K1Laser …82.54 port 28 | needs implementation |
Fan Control | Cooling for CCD controller | Footlocker in HIRES enclosure. This is part of the same power cable for the Footlocker. Single PDU connects both. | PDU Installed (same one as footlocker): PDU:KB_A1 …48G-K1Laser …82.54 port 28 | needs implementation |
Motor Control crate power supply | Motor control Crate | Old K1 laser enclosure on K1 Platform | PDU Installed: PDU: KB_A3 …48G-K1Laser 192.168.82.54 port 26 | needs implementation |
Exposure Meter | Separate system used for controlling exposure time to achieve a desired S/N | Old K1 laser enclosure on K1 Platform | PDU Installed: KA_A6 | needs implementation |
Terminal Server | For access to the motor crate | Old K1 laser enclosure on K1 Platform | PDU Installed: KA_A1 | needs implementation |
RS232 to Serial Converter1 | Fiber to/from serial conversion | Old K1 laser enclosure on K1 Platform | PDU Installed: KA_A4 | needs implementation |
RS232 to Serial Converter2 | Fiber to/from serial conversion | Old K1 laser enclosure on K1 Platform | PDU Installed: KA_A5 | needs implementation |
Ethernet Converter | 10 Base 2 to/from ethernet converter | PDU Installed: KA_A3 | needs implementation | |
HIRES server (“lehoula”) | Main computer server for the instrument | K1 computer room | PDU installed (Jet Dee) |