Sub-system PDUs (needed and/or already installed)
Sub-system | Function | Physical Location | Status | Keyword Control | ||||||
CCD controller power supply | CCD control crate | Footlocker inside HIRES enclosure. Power cord goes through wall into Old K1 laser enclosure. | PDU Installed: PDU: KB_A1 …48G-K1Laser …82.54 port 28PDU: KB_A1 | needs implementation | ||||||
Fan Control | Cooling for CCD controller | Footlocker in HIRES enclosure. This is part of the same power cable for the Footlocker. Single PDU connects both.<add additional picture> | PDU Installed (same one as footlocker): PDU:KB_A1 …48G-K1Laser …82.54 port 28PDU:KB_A1 | needs implementation | ||||||
Motor Control crate power supply | Motor control Crate | Old K1 laser enclosure on K1 Platform<add photo of plug going to PDU> | PDU Installed: PDU: KB_A3 …48G-K1Laser 192.168.82.54 port 26PDU: KB_A3 | needs implementation | Interconnect | Also needed for mechanism control | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation | |
Exposure Meter | Separate system used for controlling exposure time to achieve a desired S/N | Old K1 laser enclosure on K1 Platform | PDU NeededInstalled: KA_A6 | needs implementation | ||||||
Terminal Server | For access to the control cratesmotor crate | Old K1 laser enclosure on K1 Platform | PDU NeededInstalled: KA_A1 | needs implementationEthernet Converter | ||||||
RS232 to Serial Converter1 | Fiber to/from ethernet serial conversion | Old K1 laser enclosure on K1 Platform | PDU NeededInstalled: KA_A4 | needs implementation | ||||||
RS232 to Serial ConverterConverter2 | Fiber to/from serial conversion(?) | Old K1 laser enclosure on K1 Platform | PDU NeededInstalled: KA_A5 | needs implementation | “Cylinder control” | Unknown what this is or does. Has a sticker on it saying “HIRES” | Old K1 laser enclosure on K1 Platform. This has its own separate outlet | |||
PDU NeededEthernet Converter | 10 Base 2 to/from ethernet converter | PDU Installed: KA_A3 | needs implementation | |||||||
HIRES server (“lehoula”) | Main computer server for the instrument | K1 computer room | PDU installed (Jet Dee)TBD |