draft list so far from PSR slide:
Maintenance Procedure | Lead | Document | Notes |
---|---|---|---|
Scrambler Alignment Procedure | M. Sirk | Initial version released. Rev A in work. | |
Fiber block installation Procedure | Winlight | Released | |
Agitator Reel Removal and Fiber | S. Gibson | Draft document in-work | |
Spectrograph Installation Procedure | K. Rider | Outline document generated, procedure refined with 3x operations at UCB. | |
Spectrograph Removal Procedure | K. Rider | Outline document generated, procedure refined with 3x operations at UCB. | |
Chamber Pump-down Procedure | K. Rider | Outline document generated, procedure refined with >5x operations at UCB. | |
Chamber Vent Procedure | K. Rider | Outline document generated, procedure refined with >5x operations at UCB. | |
Shutter Replacement Procedure | S. Gibson | ||
Hollow Cathode Lamp Replacement | S. Gibson | ||
Cal Unit Alignment Procedure | S. Gibson & S. Halverson | ||
Etalon Maintenance Procedure | C. Schwab | Not yet started | |
Detector Cool-down Procedure | C. Smith | Outline document generated, procedure refined with >5x operations at UCB. | |
Detector Warm-up Procedure | C. Smith | Outline document generated, procedure refined with >5x operations at UCB. | |
LFC Maintenance Procedure |
0 Comments