Provided here is the list of maintenance procedure that KPF itemized at the Pre Ship Review.
Maintenance Procedure | Lead | Document | Notes |
---|---|---|---|
Scrambler Alignment Procedure | M. Sirk & S. Jelinsky | ||
Fiber block installation Procedure | Winlight | Released | |
Agitator Reel Removal and Fiber | S. Gibson | Draft document in-work | |
Spectrograph Installation Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with 3x operations at UCB. |
Spectrograph Removal Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with 3x operations at UCB. |
Chamber Pump-down Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with >5x operations at UCB. |
Chamber Vent Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with >5x operations at UCB. |
Shutter Replacement Procedure | S. Gibson | ||
Hollow Cathode Lamp Replacement | S. Gibson | ||
Cal Unit Alignment Procedure | S. Gibson & S. Halverson | Waiting for filter replacement. Will generate during filter installation. | |
Etalon Maintenance Procedure | C. Schwab | Not yet started | |
Detector Cool-down Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with >5x operations at UCB. |
Detector Warm-up Procedure | K. Rider | FUNDING-LIMITED | Outline document generated, procedure refined with >5x operations at UCB. |
LFC Maintenance Procedure |