Overview: We want to keep power on to the red and blue ccd controllers in order to maintain stable temperatures during the power shutdown.

Assumption: The whole instrument is on UPS power with only the red/blue detector controllers on in order to run the heaters.

Power

Keyword #

Switch AC #

Components Controlled

13

14

Red Side CCD Camera Power Supply / Controller Electronics

27

12

Blue Side CCD Power Supply / Controller Electronics

Procedure Before power down:

Prepare instrument:

Shut down power to everything other than the blue saddle bag and red archon:

Proceed to shutdown the servers in the following order:

  1. vm-lris (128.171.95.37)

  2. puako (adcserver) (128.171.95.132)

  3. lrismonored (10.95.1.71)

  4. manuka (128.171.95.107)

 

Procedure during the power down:

 Nothing to monitor 

Procedure to bring back the system

 Bring up servers in the following order:

  1. manuka

  2. lrismonored

  3. puako (adcserver)

  4. vm-lris 

Power up instrument:

 Delayed Recovery

What to do if the recovery takes longer and we need to worry about warming up. What are the triggers for starting to pump? Assume that there is no communication to the summit (computer or phone) and that servers are down. I.e., what to check on the Lakeshore screen and ion pump readout?