2024-02-14: Ion Pump Labels Swapped During Servicing Mission
During the recent servicing mission the ion pump names (ECH and COLL for echelon side and collimator side) were swapped.
On 2024-03-26 at around 11am HST, the cables at the “mushroom garden” were swapped in order for the keyword names and labels on controllers to match what they were connected to inside the vacuum chamber. After that swap, the ECH pump on both red and green cryostats were turned on by keyword. This should mean that the same physical pump was on before and after the swap, but they keywords are now correct.