| Status at Pre-Ship Review | | Outstanding Issues That Affect Operations | Outstanding Issues For KPF Team |
---|
Ca H&K Spectrometer | | | | |
Calibration Unit | Could not fully test the Calibration Unit at SSL since compensator motors had very long lead and were not in-hand. Calibration Unit was set into a state that allowed use but was not the final configuration.
| New plan is to not use motors but purchase filters with higher wedge-angle tolerances. This will make for a simpler system going forward (and one easier to maintain with 4 fewer motors involved and no look-up table to maintain)
| | Servicing mission items: |
LFC | | Comb has been operational but there has been significant down-time due to Menlo hardware and software issues. Flux in blue orders (< 500 nm) is intermittent and the bluest orders (445-480 nm) is missing from nearly all spectra.
| | |
Etalon | | Current etalon has been used regularly though the Doppler stability is not well tested over long periods because the other testing sources have had irregular availability during the past month or so. Initial results are promising on the < 1 day timescale. However etalon light source (SuperK) is failing or moving out of alignment
| | |
Cryostats/CCDs | Fully passed majority of requirements Fringing was significantly worse than requirement, plan was to correct in software Low-level illumination pattern on CCDs seen from ion pumps. This increases the effective dark current and limits faint-object performance.
| Some fixed-noise patterns on CCDs caused by insufficient grounding A new charge Transfer Efficiency (CTE) issue on one quadrant of Green CCD Fringing pattern still present Ion pump issue still present
| | Change readout mode on Green CCD to avoid CTE issue Investigate ways to minimize fringing impact within DRP Hardware fix for ion pump issue during servicing mission
|
Environmental Control System | | | | Servicing mission items: Install thermal enclosure bring linear potentiometers online (these provide bench position feedback) bring gate valve position feedback online
|
Exposure Meter | | | | |
Fiber Injection Unit | | | | |
Optical Fibers | | | | |
Agitator | | | | |
Instrument Control Software | | All dispatchers now operational “testall” script in regular use Alarm system fully functional with important alarms in place Archon has occasional trigger-signal issues Backup computer is installed at summit but not operational (needs OS installed)
| | |
Observing GUI | | | | |
Spectrometer | | Fiber block in reformatter is slightly out of alignment Green channel focus is soft in one corner of CCD Flat field fiber system needs slight realignment
| | |
SoCal | | | | |
LN2 Autofill System | | Initial tests showed major heat losses within transfer plumbing and GN2 back-pressure issues which negatively impacted dewar fills, and introduced significant thermal transients in the spectrometer System was re-designed to correct these issues Autofill system now in regular use, and KPF dewars are filled from supply dewars located in K2 machinery room
| Need an automated, daily check that fills have completed successfully and sends out alerts if not. Swapping 180 liter supply dewars every other day represents unanticipated labor. Maintenance of LN2 plumbing (vac lines, solenoids) Potential need to purge KPF LN2 lines if ice accumulation issue has not been solved.
| |