/
Subsystem Requirements
Subsystem Requirements
Subsystem | Requirements | Notes |
---|---|---|
Fiber Injection Unit
| Updates after iterations with WMKO. This version was used for the FIU PDR. | |
Green and Red CCDs | Post CCD testing | |
Vacuum Chamber | Version from MRR | |
Exposure Meter Requirements |
| |
Calcium H&K Spectrometer
|
| |
Scrambler
|
| |
Agitator |
| |
Data Reduction Pipeline | Updated for DRP review | |
Detector Cryostats
|
| |
Spectrometer Requirements
|
| |
SoCal |
|
, multiple selections available,
Related content
Instrument Subsystem Status
Instrument Subsystem Status
More like this
CCD Thermal Control System
CCD Thermal Control System
Read with this
Pre-Ship Review
Pre-Ship Review
More like this
Calibration Rack External Cables
Calibration Rack External Cables
Read with this
Subsystem Development - Lead Institutions
Subsystem Development - Lead Institutions
More like this
Thermal Sensor Locations (Spectrometer and Hallway)
Thermal Sensor Locations (Spectrometer and Hallway)
Read with this