KPF Final Components - Inspection Reports
FIU
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
|
| WMKO Drawings |
| Zip file contents: |
Calcium HK Spectrometer
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
|
|
|
Scrambler
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
July 22, 2020 |
| None | Vacuum windows (and coatings): |
|
Echelle
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
May 24, 2018 |
|
|
|
Zerodur Mounts
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
April 13, 2021 |
|
| ||
April 13, 2021 |
|
| ||
July 9, 2021 |
|
|
Rough-Cut Zerodur Blanks
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
February 5, 2020 |
| Page one of: Drawing has since been superseded by Rev 04 |
| Two blanks were cut out of the Zerodur disk. |
February 21, 2020 |
| Large slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches. | ||
February 25, 2020 |
| Page one of: | Blank cut out of the Zerodur disk. | |
February 25, 2020 |
| KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDF | Blank cut out of the Zerodur disk. | |
February 27, 2020 |
| KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDF | Blank cut out of the Zerodur disk. | |
April 7, 2020 |
| Milling at AGI prior to shipping to Winlight |
Optic Substrates
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
June 21, 2021 |
| Primary Collimator |
| |
Nov 20, 2020 |
| Secondary Collimator |
| |
Sept 25, 2020 |
| Red Prism |
| |
Sept 25, 2020 |
| Green Prism |
| |
Sept 9, 2020 |
| Red Fold Mirror |
| |
May 6, 2020 |
| Dichroic Substrate |
|
|
July 7, 2020
|
| Intermediate Fold Mirror |
|
Shims
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
3/16/2021 |
|
|
|