/
KPF Final Components - Inspection Reports
KPF Final Components - Inspection Reports
FIU
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
WMKO Drawings |
Calcium HK Spectrometer
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
KPF Approved Mechanical Drawings |
Scrambler
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
July 22, 2020 | None | Vacuum windows (and coatings): |
Echelle
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
May 24, 2018 | UC Berkeley Final Report_FINAL-1.pdf |
Zerodur Mounts
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
April 13, 2021 | KPF-SPE-MEC-201 Rev 04 Spectrometer Bench.PDF | Schott_Bench_Inspection_Report.pdf | ||
April 13, 2021 | KPF-SPE-MEC-142 Rev 01 Echelle Mounting Base.PDF | Schott_Echelle_Base_Inspection_Report.pdf | ||
July 9, 2021 | KPF-SPE-MEC-191 Rev 01 Camera Support Base.PDF | Schott_Camera_Mounts_Inspection_Report.pdf |
Rough-Cut Zerodur Blanks
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
February 5, 2020 | Page one of: KPF-SPE-MEC-122 Reformatter Mount - Rev 03.PDF Drawing has since been superseded by Rev 04 | Inspection report.pdf | Two blanks were cut out of the Zerodur disk. | |
February 21, 2020 | KPF-SPE-MEC-201B Rev 03 Zerodur Disk Cut Plan.PDF | UC BERKELEY SLICES.xlsx | Large slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches. | |
February 25, 2020 | Page one of: | UC BERKELEY IFM.xls | Blank cut out of the Zerodur disk. | |
February 25, 2020 | KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDF | UC BERKELEY SECONDARY COLLIMATOR.xls | Blank cut out of the Zerodur disk. | |
February 27, 2020 | KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDF | UC BERKELEY PRIMARY COLLIMATOR.xls | Blank cut out of the Zerodur disk. | |
April 7, 2020 | KPF-SPE-MEC-122 Reformatter Mount - Rev04.PDF | KPF Reformatter Mount Inspection.pptx | Milling at AGI prior to shipping to Winlight |
Optic Substrates
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
June 21, 2021 | Primary Collimator | KPF-SPE-MEC-132B_KPF_Pri_Collimator_EIDP.pdf | ||
Nov 20, 2020 | Secondary Collimator | EIDP- UCB Space Sciences Laboratory_PO-BB01364029 Rev 1-signed.pdf | ||
Sept 25, 2020 | Red Prism | |||
Sept 25, 2020 | ||||
Sept 9, 2020 | Red Fold Mirror | |||
May 6, 2020 | Dichroic Substrate | SSL_Dichroic_Substrate_Inspection_051120.pptx
20021_01_KPF_SPE_MEC_172_REV03_001_EXIT_SIDE _Processed.dat 20021_01_KPF_SPE_MEC_172_REV03_001_EXIT_SIDE .DAT
20021_01_KPF_SPE_MEC_172_REV03_001_TWF _Processed.dat 20021_01_KPF_SPE_MEC_172_REV03_001_TWF .DAT | ||
July 7, 2020 | Intermediate Fold Mirror |
Shims
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
3/16/2021 |
, multiple selections available,
Related content
KPF Approved Mechanical Drawings
KPF Approved Mechanical Drawings
More like this
KPF Purchase Orders
KPF Purchase Orders
More like this
KPF Cameras
KPF Cameras
More like this
Mechanical - Solid Models
Mechanical - Solid Models
More like this
KPF Electronics Home
KPF Electronics Home
More like this
KPF Reformatter
KPF Reformatter
More like this