KPF Final Components - Inspection Reports

KPF Final Components - Inspection Reports

FIU

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

 

 

 

WMKO Drawings

 

Zip file contents:

Calcium HK Spectrometer

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

 

 

KPF Approved Mechanical Drawings

 

Scrambler

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

July 22, 2020

 

None

Vacuum windows (and coatings):

 

Echelle

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

May 24, 2018

 

 

 

Zerodur Mounts

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

April 13, 2021

 

 

April 13, 2021

 

 

July 9, 2021

 

 

Rough-Cut Zerodur Blanks

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

February 5, 2020

 

Page one of:

Drawing has since been superseded by Rev 04


Corning Pictures:

Two blanks were cut out of the Zerodur disk.

February 21, 2020

 

KPF-SPE-MEC-201B Rev 03 Zerodur Disk Cut Plan.PDF

Large slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches.

February 25, 2020

 

Page one of:

KPF-SPE-MEC-152 Intermediate Fold Mirror - Rev 05.PDF

Blank cut out of the Zerodur disk.

February 25, 2020

 

KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDF

Blank cut out of the Zerodur disk.

February 27, 2020

 

KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDF

Blank cut out of the Zerodur disk.

April 7, 2020

 

Milling at AGI prior to shipping to Winlight

 

Optic Substrates

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

June 21, 2021

 

Primary Collimator

 

Nov 20, 2020

 

Secondary Collimator

 

Sept 25, 2020

 

Red Prism

 

Sept 25, 2020

 

Green Prism

 

Sept 9, 2020

 

Red Fold Mirror

 

May 6, 2020

 

Dichroic Substrate

 













 

July 7, 2020

 

 

Intermediate Fold Mirror

 

 

Shims

Date

Final Quote

As-Built Drawing

Compliance/
Certification Docs

Notes

3/16/2021