/
KPF Final Components - Inspection Reports

KPF Final Components - Inspection Reports

FIU

Calcium HK Spectrometer

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes


KPF Approved Mechanical Drawings

Ca HK Optimax Final Reports (from Ashley).zip


Scrambler

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
July 22, 2020


None

Vacuum windows (and coatings):

KPF_Scrambler_WedgeWindow_CoC.pdf


Echelle

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
May 24, 2018

UC Berkeley Final Report_FINAL-1.pdf

Zerodur Mounts

Rough-Cut Zerodur Blanks

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
February 5, 2020

Page one of:

KPF-SPE-MEC-122 Reformatter Mount - Rev 03.PDF

Drawing has since been superseded by Rev 04

Inspection report.pdf
Corning Pictures:
REFORMATTER A.rar
REFORMATTER B.rar

Two blanks were cut out of the Zerodur disk.
February 21, 2020
KPF-SPE-MEC-201B Rev 03 Zerodur Disk Cut Plan.PDFUC BERKELEY SLICES.xlsxLarge slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches.
February 25, 2020

Page one of:

KPF-SPE-MEC-152 Intermediate Fold Mirror - Rev 05.PDF

UC BERKELEY IFM.xlsBlank cut out of the Zerodur disk.
February 25, 2020
KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDFUC BERKELEY SECONDARY COLLIMATOR.xlsBlank cut out of the Zerodur disk.
February 27, 2020
KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDFUC BERKELEY PRIMARY COLLIMATOR.xlsBlank cut out of the Zerodur disk.
April 7, 2020


KPF-SPE-MEC-122 Reformatter Mount - Rev04.PDFKPF Reformatter Mount Inspection.pptxMilling at AGI prior to shipping to Winlight


Optic Substrates

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
June 21, 2021

Primary Collimator

KPF-SPE-MEC-132B Primary Collimator - Rev 06.PDF

KPF-SPE-MEC-132B_KPF_Pri_Collimator_EIDP.pdf
Nov 20, 2020

Secondary Collimator

KPF-SPE-MEC-162B Secondary Collimator - Rev 04.PDF

EIDP- UCB Space Sciences Laboratory_PO-BB01364029 Rev 1-signed.pdf
Sept 25, 2020

Red Prism

KPF-CAM-MEC-211 Red Camera Prism - Rev 08.PDF

Insp Report.pdf

Enviro.pdf

Coat Charts.xlsx

Material Cert.pdf

Zygo 1.pdf

Zygo 2.pdf

Zygo 3.pdf


Sept 25, 2020

Insp Report.pdf

Enviro Test.pdf

7487000 - 00908BM Coat.xlsx

7487000-6920-3 Material Cert.pdf

Green Zygo 1.pdf

Green Zygo 2.pdf

Green Zygo 3.pdf


Sept 9, 2020

Red Fold Mirror

KPF-SPE-MEC-182-O Red Fold Mirror - Optical - Rev 01.PDF

SSL_Red_Fold_Inspection_090920.pptx

Bond_Red_Fold_Post_Grind_EIDP.pdf


May 6, 2020

Dichroic Substrate

KPF-SPE-MEC-172 Dichroic with Wedge - Rev 03.PDF


July 7, 2020



Intermediate Fold Mirror

KPF-SPE-MEC-152 Intermediate Fold Mirror - Rev 05.PDF

SSL_IFM_Substrate_Inspection_070720.pptx

Mindrum_Data_Pack.pdf



Shims





















Related content

KPF Approved Mechanical Drawings
KPF Approved Mechanical Drawings
More like this
KPF Purchase Orders
KPF Purchase Orders
More like this
KPF Cameras
KPF Cameras
More like this
Mechanical - Solid Models
Mechanical - Solid Models
More like this
KPF Electronics Home
KPF Electronics Home
More like this
KPF Reformatter
KPF Reformatter
More like this