KPF Final Components - Inspection Reports

KPF Final Components - Inspection Reports

FIU

Calcium HK Spectrometer

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes


KPF Approved Mechanical Drawings

Ca HK Optimax Final Reports (from Ashley).zip


Scrambler

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
July 22, 2020


None

Vacuum windows (and coatings):

KPF_Scrambler_WedgeWindow_CoC.pdf


Echelle

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
May 24, 2018

UC Berkeley Final Report_FINAL-1.pdf

Zerodur Mounts

Rough-Cut Zerodur Blanks

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
February 5, 2020

Page one of:

KPF-SPE-MEC-122 Reformatter Mount - Rev 03.PDF

Drawing has since been superseded by Rev 04

Inspection report.pdf
Corning Pictures:
REFORMATTER A.rar
REFORMATTER B.rar

Two blanks were cut out of the Zerodur disk.
February 21, 2020
KPF-SPE-MEC-201B Rev 03 Zerodur Disk Cut Plan.PDFUC BERKELEY SLICES.xlsxLarge slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches.
February 25, 2020

Page one of:

KPF-SPE-MEC-152 Intermediate Fold Mirror - Rev 05.PDF

UC BERKELEY IFM.xlsBlank cut out of the Zerodur disk.
February 25, 2020
KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDFUC BERKELEY SECONDARY COLLIMATOR.xlsBlank cut out of the Zerodur disk.
February 27, 2020
KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDFUC BERKELEY PRIMARY COLLIMATOR.xlsBlank cut out of the Zerodur disk.
April 7, 2020


KPF-SPE-MEC-122 Reformatter Mount - Rev04.PDFKPF Reformatter Mount Inspection.pptxMilling at AGI prior to shipping to Winlight


Optic Substrates

Date

Final Quote

As-Built DrawingCompliance/
Certification Docs
Notes
June 21, 2021

Primary Collimator

KPF-SPE-MEC-132B Primary Collimator - Rev 06.PDF

KPF-SPE-MEC-132B_KPF_Pri_Collimator_EIDP.pdf
Nov 20, 2020

Secondary Collimator

KPF-SPE-MEC-162B Secondary Collimator - Rev 04.PDF

EIDP- UCB Space Sciences Laboratory_PO-BB01364029 Rev 1-signed.pdf
Sept 25, 2020

Red Prism

KPF-CAM-MEC-211 Red Camera Prism - Rev 08.PDF

Insp Report.pdf

Enviro.pdf

Coat Charts.xlsx

Material Cert.pdf

Zygo 1.pdf

Zygo 2.pdf

Zygo 3.pdf


Sept 25, 2020

Insp Report.pdf

Enviro Test.pdf

7487000 - 00908BM Coat.xlsx

7487000-6920-3 Material Cert.pdf

Green Zygo 1.pdf

Green Zygo 2.pdf

Green Zygo 3.pdf


Sept 9, 2020

Red Fold Mirror

KPF-SPE-MEC-182-O Red Fold Mirror - Optical - Rev 01.PDF

SSL_Red_Fold_Inspection_090920.pptx

Bond_Red_Fold_Post_Grind_EIDP.pdf


May 6, 2020

Dichroic Substrate

KPF-SPE-MEC-172 Dichroic with Wedge - Rev 03.PDF


July 7, 2020



Intermediate Fold Mirror

KPF-SPE-MEC-152 Intermediate Fold Mirror - Rev 05.PDF

SSL_IFM_Substrate_Inspection_070720.pptx

Mindrum_Data_Pack.pdf



Shims