KPF VPH Gratings

KPF VPH Gratings

Grism Bonding Final Reports (from KOSI)

Description

Date

File

Notes

Green grism final report

March 12, 2021

Green grism was made to Rev 6 drawing

Red grism final report

March 12, 2021

Red grism was made to Rev 5 drawing

UCB Measurement Results (Prelim)

Grating

Results

Datafiles

Green

Red

VPH Grating Final Reports (from KOSI)

Description

Date

File

Notes

Off-plane Angle Measurement
(from report)

Green grating final report

September 12, 2019

Green grating was made to Rev 4 drawing

SG conversion:  +0.0583 deg

Red grating final report

November 19, 2019

Red grating was made to Rev 2 drawing

SG conversion: -0.0125 deg

 

Grating test rig

Control software documentation (July 2019)

Copies of the manual and code are also stored in the control computer

Document

File

Python manual

Control software (Python) zip

 

Grating RFP

Documents sent as part of official UCB RFP in June 2018

     RFP sent to KOSI and Wasatch

Document

File

RFP v. June 14

SOW v. June 14 b

Spec v. 8.2

Green VPH drawing, rev 1

Red VPH drawing, rev 1

VPH substrate dwg, rev 2

RFP response from KOSI:

 

 

Whether to wedge the VPH cover substrate:  

Green Channel VPH ROM Quote from KOSI (June 2015):

Date

Description

File

June 17, 2015

RFI sent to KOSI

June 17, 2015

Our specifications

July 9, 2015

Response from Jim Arns