/
KPF Purchase Orders

KPF Purchase Orders

This page contains list of purchase orders, including the KPF spec documents, PO, and deliverables from the vendors.

Some supporting docs may be located at other pages.

ItemVendorDate of POPO #Documents
Thorium and Uranium HCL LampsDelta ScientificJuly 31, 2020BB01387735Order acknowledgement_000000000102094-2.pdf
Scrambler vacuum windowsLambda Research OpticsJune 25, 2020BB01377686

Scrambler vacuum window quote details.txt

Scrambler lensesRoss OpticalJune 22, 202019289

Quote from Ross (June 22, 2020):   47-15130 UC Berkeley-4.pdf

Updated quote from Ross with the extra 4 lenses:   UNIVERSITY OF BERKELEY 19289 ADD ON-3.pdf

Dichroic coating

Materion



Materion updated quote (May 12, 2020):

Updated Materion Proposal:

Materion - KPF proposal_updated May 2020.docx

Updated Materion Quote:

2005-5004DM.pdf

Updated Materion Schedule:

KPF milestone schedule_updated May 11, 2020.mpp

KPF request for updated quote (May 5, 2020):

Email sent to Materion requesting quote refresh:

Request for quote for Keck Planet Finder.pdf

Requirements doc sent to Materion:

KPF Dichroic Spec 8.xlsx

Drawing sent to Materion:

KPF-SPE-MEC-172 Dichroic with Wedge - Rev 03.PDF

Primary and Secondary Collimators

Precision Asphere
(now part of II-VI)

April 21, 2020

BB01364029

Requirements docs sent to PA (March 5, 2020):

KPF Primary Collimator Spec v4.xlsx
KPF Secondary Collimator Spec v4.xlsx

Drawings sent to PA (March 5, 2020):

KPF-SPE-MEC-132B Primary Collimator - Rev 06.PDF
KPF-SPE-MEC-162B Secondary Collimator - Rev 04.PDF

"Red" AR coating of VPH grating substrate

PFG Precision Optics

Apr 30, 2019

BB01220215

Spec:  Coating Spec for KPF grating substrate - v6.xlsx

Updated quote:  PFG quote RFQ-10288.update - rev2.pdf

Purchase request:  PR for red AR coating from PFG.pdf

Received at SSL Sept 3 2019, inspection report:  Inspection of PFG AR coated red grating substrate - 3sep2019.docx

Measured transmission of coating (ridealong witness, pre/post environ testing):  8000358 - 90820BM - environ pre-post meas w same witness.xls

Wavefront data:  Red AR coating verification data - WFE only.pptx

VPH substrates, 2xPG&OApr 15, 2019BB01212019

First part received at SSL, July 22 and 30, 2019, SN 008:

        PG&O inspection documents:  paper reports that came in box 22july2019.pdf

        SSL inspection:  PGO grating substrates - subapertures v2.pptx

                                   SN 008 fracture.pptx

Second part received at SSL Aug 6 and 13, 2019, SN 007

        PG&O inspection documents:  scan of reports shipped in box with substrate.pdf

        SSL inspection:  SN 007 chip repair.pptx

"green" AR coating of grating substratePFG Precision OpticsMar 15, 2019BB01198479

Received at SSL Apr 12 2019, inspection report:  Inspection of PFG AR coated green substrate - 12apr2019.docx

                                                    photos from inspection:  Inspection of PFG AR coated green substrate 12apr2019.pptx

Measured transmission of coating, and prelim wavefront data:  8000357 - 90405BM Spectral Data and WFE data - coated substrate.xlsx

ReformatterWinlightDec 6, 2018BB01156851see Reformatter page    - for proposal and spec documents
Green VPH gratingKOSINov 20, 2018
see VPH grating page    - for proposal and spec documents
VPH substrates (green only), 6xPG&ONov 6, 2018BB01144273

First 4x parts received at SSL Mar 8 2019:

        PG&O inspection documents:  Inspection reports.pdf

        SSL inspection, summary slides:  Inspection of PGO grating substrates - first 4x - 11march2019.pptx

        SSL inspection, detailed report:  Inspection of PGO grating substrates - first 4x - 11march2019 - v2.docx

Last 2x parts received at SSL Mar 15 2019:

        PG&O inspection documents:  Inspection reports.pdf

        SSL inspection, summary slides:  Inspection of PGO grating substrates - next 2x - 18march2019.pptx

        SSL inspection, detailed report:  Inspection of PGO grating substrates - next 2x - 18mar2019.docx

Echelle GratingNewport RGLDec 27, 2016BB00832441see Echelle page    - for proposal, spec documents, PO, vendor final report
ETU ShimsMindrum

Mar 27, 2017 (24x)

Sept 19, 2017 (5x more)

BB00873739
Dichroic SubstrateBond Optics

Drawing:   KPF-SPE-MEC-172 Dichroic with Wedge - Rev 03.PDF















Related content

KPF Final Components - Inspection Reports
KPF Final Components - Inspection Reports
More like this
KPF Approved Mechanical Drawings
KPF Approved Mechanical Drawings
More like this
KPF Echelle Grating
KPF Echelle Grating
More like this
2021-06-24 Meeting notes
2021-06-24 Meeting notes
More like this
Keck Planet Finder (KPF)
Keck Planet Finder (KPF)
More like this
2020-05-12 Meeting notes
2020-05-12 Meeting notes
More like this