2022-06-09 Meeting notes

2022-06-09 Meeting notes

 Date

Jun 9, 2022

 Participants

  • @Chien-Hsiu Lee (Unlicensed)@Carolyn Jordan @Randy Campbell @Kyle Lanclos@Greg Doppmann @Percy Gomez @Max Service @Rosalie McGurk

  • @Josh Walawender @Michael Lundquist @John O'Meara @Marc Kassis

 Goals

  •  

 Discussion topics

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

1:05

Words from Randy

Randy

  • Staffing:

    • Joel retiring June 30. Let Carolyn or Randy know if you want to contribute something to honoring him.

    • Maybe Zoom in to last OA meeting on June 30 to send greetings.

    • Have OA job open, collecting applicants

    • Logan will be leaving for position at Gemini. Will be looking for replacement, so more OAs at summit until replaced.

  • Lots of COVID running around the staff on summit and HQ.

    • Leading to some operations changes. SegEx on K2 cancelled as announced this morning. Will be some GBS scheduled.

    • On K1, affected AO plans in coming days. May be schedule changes and GBS there.

  • Council update from meeting today

    • Thematic goal is currently retention

    • Still important to keep as thematic goal

1:12

Words from John

John

  • Council

    • Will take 30,000 foot view of some previous initiatives

    • Close out or stop some to avoid leaving issues “dangling”

    • Many people out at AAS next week

  • Community outreach updates from yesterday reflects a lot of work and a substantial change from past

  • Randy: KPF Pre-Ship Review is Wed/Thurs of next week. Carolyn, Randy, Jeff M. are on review committee and will be away

    • FIU is in lab here at HQ

    • Marc: reach out to Carolyn, Randy, or Marc if you want to sit in on review. If you want to see FIU, ask Josh or Kyle.

1:17

Keck Science Meeting

Randy/John?

Keck Science Meeting SA representative needed for SOC.  Event date: September 15-16 at Caltech

  • Meeting is hybrid

  • Contact John if you would like to be SA rep.

  • ID an SA rep in next two weeks

1:19

Update on Observing Definition Tool Design Process

Josh

Josh suggested to Jeff M. during DSI meeting to take a step back as a workflow in mind.

Rather than submitting comments on the existing tool, give feedbacks on the workflow.

ODT needs to have 2 main goals:
1. see all OBs in one place
2. edit or change OBs in detail

want to dedicated significant portion of the screen to those goals.

A big table providing high level of view to all OBs.

Drop down buttons in the overview table to see/edit details of elements in an OB.

Greg: can we have a list and sequences of pre-populated OBs. Josh: very solid suggestion, need to talk with s/w folks for details.

Percy: visualization tools, e.g. see slit orientation on top of a finding chart. Josh: would be really nice to have these tools at hand (e.g. exposure time calculator), but needs to check if these tools fit in the budget. Taylor is working on a planning tool separate from ODT.

Randy: laying out observing plan like a log for simplicity. Thinking about how observers operate now; not only design ODT weeks in advance, but can operate in real time at night. Taking test exposures and modify ODTs. Josh: can prepare a short exposure into the sequence as a test exposure, and a long exposure as target. Having a separate table of targets, can fetch previous semester targets info into OBs without typing again.

Percy: It would be great to directly interact with DRP and link that with ODT/OB. Josh: it is possible.

Randy: one of the biggest difference is combining acquisition with observation in the ODTs. Josh: sounds scary but it is simple by explicitly spell out nuances (like off-set stars).

Marc: is it possible to download/upload OBs? Josh: yes. John: we want to be able to receive OBs from users without diving into ODTs.

John: needs to work more on Target Management. Each observer can have a database of Target in their keck observer login, and import those targets to ODTs. Advise to talk to Taylor soon, to avoid significant changes in the ODT design.

1:43

Review SW Ops issue JIRA list

Kyle

SWOPS Board

  • Randy: nice to have a list with priorities, may need to work more on managing the priorities; can we use the list to assign tasks and communicate to S/W team? Kyle: Can assign tasks by creating a ticket; the Jira list does not hamper direct communication.

    Percy: duplicate with ECR? Randy: small things or wishlist go to Jira list, major works go to ECR. Josh: Jira list can be useful to track progress. Randy: Take Jira list as an accounting record, review the listed items during SA meetings as needed.

2:01

NIRSPEC UPS installation (on instrument) summary

Greg

CI project (now complete):

Dell Technologies:  $481.89

APC Smart-UPS 750VA LCD - UPS - AC 120 V - 500 Watt - 750 VA Ethernet, RS-232, USB - output connectors- 6 - black - with APC SmartConnect.

  • Kyle: UPSs do not fail gracefully as they age, so be sure they are maintained

  • Useful on other instruments?

    • MOSFIRE: space and balance issues

    • KCWI: yes, probably

2:07

K1RO UPS Update

Randy/Carolyn

  • UPS replaced in K1RO

  • Much quieter

  • In a different place due to regulations

  • Goal is 1 hour uptime, but this is not limiting factor

2:10

Pau!

 

 

 Action items

 Decisions

Related content

2022-05-26 Meeting notes
2022-05-26 Meeting notes
Read with this
2022-07-07 Meeting notes
2022-07-07 Meeting notes
More like this
SA meetings notes
SA meetings notes
Read with this
2024-02-01 Meeting notes
2024-02-01 Meeting notes
More like this
2024-01-18 Meeting notes
2024-01-18 Meeting notes
More like this
2023-07-20 Meeting notes
2023-07-20 Meeting notes
More like this