| | | |
---|
1:02pm | Words from Randy | Randy | |
1:10 | Mauna Loa Eruption | Randy | New closure parameters sent out Changed particle count threshold down to 250, still a judgement call by OAs Other criteria: humidity above 50% is unsafe now Now have SO2 sensors, so may use those in criteria in future, but establishing baseline now. For now assume SO2 is present. They are handheld and portable. Want to get permanent ones to provide values to keywords. CFHT particle sensor matches ours (both are inside dome) We have new particle sensors from UNO (one in each dome), not accessible outside Keck network Working with outside org who wants to install outdoor sensors, perhaps with wider sensitivity to other chemicals Can be HF in volcanic fumes Winds can kick up previously fallen material regardless of wind direction
|
1:32 | UNO | Randy | Bob wanted to talk about instruments about checking and release of instruments. Readiness board combines many conditions to provide an “ok to depart” status for day crew Percy: LRIS for example needs observers to verify instrument config Josh: procedural tasks should me managed on SIAS since they are already taken in to account for the departure screen Guiders are in “no man’s land between instrument and telescope” Percy: primary and standby instrument? Yes. Kyle: we have EMIR running for several current systems Liz is going to work on some sort of guider checkout under ops (not UNO) Computer support has network monitoring tools which are not available to us, but may be in the future
|
1:55 | HQ Power Outage | Josh | |
2:03 | Promoting teamwork and collaboration | Randy | Fewer gatherings in post-COVID world How can we promote more teamwork on projects, more social interactions, etc. Promote more TK collaborations Science lunch talks? e.g. Larissa next Tuesday Reinstate SA Coffee? With portable zoom station Josh: How useful are software standup meetings? Problem with SA schedules, hard to find consistent times to work together which don't require constant adjustment Kyle: how you chop up projects matters, is you avoid vertical integration in the project, you can promote interactions Josh/Jim: do something akin to Marc’s KNIT meetings, but focussed only on SA tasks (not s/w team, not engineering) Randy: have scheduled office day to promote hallway interactions?
|
2:29 | K1 Shutter Status? | | |
2:30 | Pau! | | |