Faults:
Trouble deploying grism (K1-33244)
LRIS red CCD not working (K1-33256 00:30)
Power cycle red ccd controller
LRIS grating trouble (K1-33267 02:48)
Issues with turret encoder
Multiple exposures on the red side failed (K1-33268 00:02)
Lrisplus not active
On this issue, mention observers of the limitations of running scripts (change of exp time does not affect all exposures)
Some other faults not related to lris (magiq DSS and other issues)
WORK DONE:
Examine grating encoder. Put the encoder on a PDU (slot 25)
Checking CMDLRIS
Improving polarimeter operations
TO BE DONE:
GUIs
Recreate the focus table (ongoing)
Monthly Checkouts (new run starts on June 11with Chien-Hsiu)
Power cycle blue side
New interim procedure on confluence:
Logon to 192.168.80.184 admin/admin
Select A1 PDU (check)
Inmediate Off
Inmediate ON
Startcrate blue
Other Items:
Refurbishing plans. This has been delayed due to shortage of staff.
Prepare CI for:
Polarimeter controllers (API to Galil)
Autofill system
Maskcutter spare
UNO checks.
New checkall -> feed keyword
New checkall includes mask verification
XLRIS version. Final review of cmdlris
Autoslit
Power control:
Needs to include the grating turret encoder
Blue crate needs to be added to keyword system
New lredccd
SOFTWARE
GUIs
autoslit
HARDWARE
-Still pending the issue of the cover paint.
-M Lundquist to work on details for collimator cleaning