MOSFIRE Readiness

No additional power cycling capabilities needed.

Power Outage Procedure

  • Shut down instrument software in preparation for powering things off

    • Run CSUSTOP

      • modify -s mcsus stopcsu=1

    • Ensure detector is put to bed gently

      • modify -s mds abort=1

      • modify -s mds powerdown=1

      • mosfire stop mds

  • Go to low power mode by turning off components in the electronics cabinet

    • Power down these components (e.g. using the Power Control GUI):

      • CSU Controller

      • CSU Drives

      • Jade 2

      • Computer

      • Ne lamp

      • Ar lamp

      • Guider focus galil (these prevent frost on guider, so probably need to leave these on?)

      • Guider camera electronics (these prevent frost on guider, so probably need to leave these on?)

      • Motor box

      • FCS controller

    • This leaves telemetry active (needs mosfireserver and vm-mosfire)

      • Could shut down Kaimana if desperate

Related content

DEIMOS Readiness
DEIMOS Readiness
Read with this
MOSFIRE
More like this
LRIS
More like this
KPF Readiness
KPF Readiness
More like this
Power Outage Procedures
Power Outage Procedures
More like this
AST Project (Nov 6 and 7, 2024)
AST Project (Nov 6 and 7, 2024)
More like this