MOSFIRE Readiness
No additional power cycling capabilities needed.
Power Outage Procedure
Shut down instrument software in preparation for powering things off
Run CSUSTOP
modify -s mcsus stopcsu=1
Ensure detector is put to bed gently
modify -s mds abort=1
modify -s mds powerdown=1
mosfire stop mds
Go to low power mode by turning off components in the electronics cabinet
Power down these components (e.g. using the Power Control GUI):
CSU Controller
CSU Drives
Jade 2
Computer
Ne lamp
Ar lamp
Guider focus galil (these prevent frost on guider, so probably need to leave these on?)
Guider camera electronics (these prevent frost on guider, so probably need to leave these on?)
Motor box
FCS controller
This leaves telemetry active (needs mosfireserver and vm-mosfire)
Could shut down Kaimana if desperate
, multiple selections available,
Related content
DEIMOS Readiness
DEIMOS Readiness
Read with this
MOSFIRE
MOSFIRE
More like this
LRIS
More like this
KPF Readiness
KPF Readiness
More like this
Power Outage Procedures
Power Outage Procedures
More like this
AST Project (Nov 6 and 7, 2024)
AST Project (Nov 6 and 7, 2024)
More like this