OSIRIS

OSIRIS

Battery need

  • Prefer to keep both spectrograph and imager Lakeshore powered up with UPSs

Procedure Before power down

  • On Nov 4: Sherry run osirisStartWarmup to
    set both detector target temperatures to 80K
    lock all the mechanisms
    start temperature and pressure logging
    keep detectors powered on by
    oids.powerdown=0 and osds.powerdown=0

  • On Nov 6, by 8:30 am: Sherry power off spec and imag detectors by oids.powerdown=1 and osds.powerdown=1, then run osirisDisconnect

  • On Nov 6, IT turn off:
    osiris-drp
    vm-osiris
    osirisimag
    osirisspec
    osiris-control2
    osiris-control1
    osirisserver

  • On Nov 6, summit turn off CCR right before 9:30

Procedure during the power down

None

Procedure to bring back the system

  • Summit turn on CCR

  • IT Bring up:
    osirisserver
    osirisspec
    osirisimag
    vm-osiris
    osiris-drp

  • If the computers are up:

    • Sherry will run osirisConnect which will power on the lakeshores and instrument
      osiris-control1
      osiris-control2
      will be connected after osirisConnect is complete.

    • Sherry will run osirisStartCooldown to set spec and imag detector target temperature to 72K and 70K

    • Sherry checks if the heaters for spec and imag detectors are up and running and keep both detectors at target temperature . It will likely take more work to bring up the spec detector heater, see Kd1-32369

Related content

MOSFIRE
More like this
KCWI
More like this
LRIS
More like this
AST Project (Nov 6 and 7, 2024)
AST Project (Nov 6 and 7, 2024)
More like this
NIRC2
Read with this
Temperature Alerts for Instruments
Temperature Alerts for Instruments
More like this