1:00 | Words from John | John | |
1:25
| Words from Jim
| Jim
| Grab bag Pier repair started KPF service OSIRIS warming MOSFIRE CSU still down, working with BenM for more resources K1AO /kroot update K2AO back on-sky with OCAM2k ESI remaining cold DEIMOS rotator chain break--fixed? Carlos: running a procedure to rebalance the rotator, hasnt been done in a long time. When turning the rotator with a computer bypass, not paying attention to soft limit switch and made it all the way to the hard stop. Cable wrap was not broken thanks to instrument limits. Master link on the chain broke and master rotator stopped. Was replaced with a spare yesterday and everything is back to normal. Instrument incident report submitted. NIRES readout and rotator issues. Josh: possibly replaced today, reasons for optimism
5 year plan campus visits Andy Skemer here next Tue/Wed? Bogie work on K2: reduced speed yesterday due to pulling one bogie out- put replacement in today and up speed. Updated design, since first design was prone to failure. All are updated in K1. Next bogie replacement is next Wednesday. Randy: pier repair going as expected? Yes so far! “good rhythm”. Heat blankets go on saturday or sunday. Dust monitoring happening with no cause for alarm so far.
|
1:42 | Instrument Disk Usage | | |
1:43 | SA Hiring update | | Panel interviews complete - 9 people Asking to bring in 5 for 2 positions Administrative assistant - panel interviews happening now. 4/6 outstanding candidates.
|
1:45 | Team Keck | | |
1:47 | keanahaki retirement | Jim | Computer Support is ready to turn off keanahaki Some accounts for instruments still have crons running--mostly conk and update_config_files |
1:49 | Inst Checkouts | Jim | UNO-driven “UNO is coming…” |
2:00 | UNO Update | Carolyn | Phase 1 operations. UNO tools should be used. Close to moving to Phase 2 operations, everything is done and everything released for OA. run at least 6 months To get there, roll out autonomous facility protection. Big release yesterday, daytime testing end of month. Engineering night on K2 on the 8th for release. April 18th phase 2 readiness review, internal only review Phase 3, no one up at the summit, maybe some oncall support
|
2:10 | | | Pau Next meeting lead: Rosalie! |