2020-04-28 Meeting notes

2020-04-28 Meeting notes

Date

Apr 28, 2020

Participants

  • @Josh Walawender

  • @Luca Rizzi

  • @Carlos Alvarez

  • @Greg Doppmann

  • @John O'Meara

  • @sherry yeh

  • @Randy Campbell

  • @Elena Manjavacas (Unlicensed)

  • @Percy Gomez

  • @jguerra (Unlicensed)

  • @Jim Lyke

Goals

Discussion topics

Time

Item

Presenter

Notes

11:30

Words from John

John

  • Had a good meeting with PypeIt team about MOSFIRE requirements

  • Marc and Carolyn have been tasked with return to operations strategy

  • Group to think/brainstorm about return to operations project for the summit

  • All MK directors are looking at recent Gov order

  • MK observatories trying to get included in the non-essential business to return to operations during phase in

  • How are other observatories coping? John says depends on scale. Everyone wants to get back to ops.

11:36

Words from Randy

Randy

  • Randy sent notice to May observers reflecting current situation/uncertainty.

  • Return to ops, work around a few assumptions:

    • We’ll have some notice (a week?)

    • Maybe mid-May?

  • Would there be an opt-out option without retaliation? If employee has vacation to use and chooses to use it

  • Randy to do rolling cancellation of observing nights. Through May 10 for now.

  • Day crews will likely need ramp up time after we get access back.

  • Do we bring one telescope back on sky before the other? Maybe not, 2 is not much harder than 1.

  • Will we make schedule adjustments? An instrument like LRIS may not be ready quickly. Might shift programs or do engineering.

  • Can have long slit ready sooner (for LRIS and DEIMOS), so perhaps cancel MOS runs on different schedule?

  • Instrument reconfigs will likely not happen during first ramp up period because multiple techs needed in small area.

  • Keck will likely have its own requirements, procedures, protocols to convince state for return to operations. One will likely limit people working in close proximity.

12:13

Review of action items

 

  • completed

  • VNC passwords for [instr]eng to be changed: NIRSPEC, HIRES, MOSFIRE, OSIRIS done and confirmed

  • Should we eliminate the showpasswords script on the old Sun machines?

12:16

PypeIt Requirements

Josh

  • Interface with @Josh Walawender on MOSFIRE requirements, he will interface with PypeIt team

12:20

Instrument Scripts

Randy

  • Charge hours to UNO

  • @Josh Walawender will come to group about documenting existing testAll and desired checks

12:23

Email

Randy

  • Observatory is migrating to Office 365.

  • MS Teams is being proposed as alternative to Atlassian suite due to relationship with Office 365

  • Remember: MS Teams and Atlassian suite are not one to one replacements for one another

12:37

Data taking

Luca

  • For engineering data, if you take data in a numbered account, it goes to a PI. This causes KOA people to have to manually reassign data. Use eng account when possible. If you have to take data in a numbered account, set OUTDIR to a non-standard directory (i.e. \tmp).

  • Interface with KOA if you need to take data in numbered accounts, so they can handle the data properly.

  • For instruments which don’t use PROGNAME:

    • Data in numbered account gets assigned to a PI who is on the schedule for the night

    • Data in eng account is ingested by KOA as engineering data and made public

    • Data sent to other directory (i.e. /tmp) is not ingested.

12:51

Pau!

 

 

Action items

Decisions

 

Related content

2020-05-12 Meeting notes
2020-05-12 Meeting notes
More like this
2020-12-03 Meeting notes
2020-12-03 Meeting notes
More like this
2020-04-14 Meeting notes
2020-04-14 Meeting notes
More like this
2020-05-05 Meeting notes
2020-05-05 Meeting notes
More like this
2021-06-24 Meeting notes
2021-06-24 Meeting notes
More like this
2021-02-25 Meeting notes
2021-02-25 Meeting notes
More like this