Engineering ideas
Program | Instrument(s) | Estimated time | SA and other staff involved |
---|---|---|---|
Science verification of DEIMOS polo migration to Linux and rotator controller upgrade. Test GUIs and operation scripts on sky with a DEIMOS observer. | DEIMOS | Two 0.5 nights separated by two weeks. | C. Alvarez. S. Kwok, K. Lanclos and W. Deich (UCSC) on call. |
K1 LGS Engineering
| OSIRIS | 2, but separate half nights if can. | J. Lyke, JC Guerra, S. Yeh, S. Cetre |
PyWFS and SH switch back and forth on sky (procedure needs to be practiced during daytime BEFORE nighttime engineering) | NIRC2 |
| P. Gomez, JC Guerra, C. Bond, S. Cetre |
NGS-AO performances and stability using 1.0 plate scale for KI and KII | OSIRIS NIRC2 |
| JC Guerra |
NIRES engineering:
night time:
| NIRES | 5 hours | P. Gomez (all) M. Baril (daytime 1) S. Kwok (night time 3) K. Laclos (daytime 1) A. Rostopchina (night time 1) |
KAPA Laser engineering | OSIRIS | 1 | J. Lyke, S. Ragland, S. Cetre, E. Wetherell |
NIRSPEC SCAM guiding on sky. Test and optimize SCAM acquisition and Magiq/SCAM guiding for M-band objects imaged on SCAM directly. This would make use of the recently optimized detector settings for the high background Mband imaging case. | NIRSPEC | 0.5 night | G. Doppmann, S Kwok |