draft list so far from PSR slide:Provided here is the list of maintenance procedure that KPF itemized at the Pre Ship Review.
Maintenance Procedure | Lead | Document | Notes | ||||||
---|---|---|---|---|---|---|---|---|---|
Scrambler Alignment Procedure | M. Sirk Initial version released. Rev A in work.& S. Jelinsky |
| |||||||
Fiber block installation Procedure | Winlight |
| Released | ||||||
Agitator Reel Removal and Fiber | S. Gibson | Draft document in-work | |||||||
Spectrograph Installation Procedure | K. Rider |
| Outline document generated, procedure refined with 3x operations at UCB. | ||||||
Spectrograph Removal Procedure | K. Rider |
| Outline document generated, procedure refined with 3x operations at UCB. | ||||||
Chamber Pump-down Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Chamber Vent Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Shutter Replacement Procedure | S. Gibson | ||||||||
Hollow Cathode Lamp Replacement | S. Gibson | ||||||||
Cal Unit Alignment Procedure | S. Gibson & S. Halverson | Waiting for filter replacement. Will generate during filter installation. | |||||||
Etalon Maintenance Procedure | C. Schwab | Not yet started | |||||||
Detector Cool-down Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
Detector Warm-up Procedure | K. Rider |
| Outline document generated, procedure refined with >5x operations at UCB. | ||||||
LFC Maintenance Procedure |
...