draft list so far from PSR slide:

Maintenance Procedure

Lead

Document

Notes

Scrambler Alignment Procedure

M. Sirk

Initial version released. Rev A in work.

Fiber block installation Procedure

Winlight

Released

Agitator Reel Removal and Fiber
Setup Procedure

S. Gibson
M. Sirk

Draft document in-work

Spectrograph Installation Procedure

K. Rider

Outline document generated, procedure refined with 3x operations at UCB.

Spectrograph Removal Procedure

K. Rider

Outline document generated, procedure refined with 3x operations at UCB.

Chamber Pump-down Procedure

K. Rider

Outline document generated, procedure refined with >5x operations at UCB.

Chamber Vent Procedure

K. Rider

Outline document generated, procedure refined with >5x operations at UCB.

Shutter Replacement Procedure

S. Gibson

Hollow Cathode Lamp Replacement
Procedure

S. Gibson

Cal Unit Alignment Procedure

S. Gibson & S. Halverson

Waiting for filter replacement. Will generate during filter installation.

Etalon Maintenance Procedure

C. Schwab

Not yet started

Detector Cool-down Procedure

K. Rider

Outline document generated, procedure refined with >5x operations at UCB.

Detector Warm-up Procedure

K. Rider

Outline document generated, procedure refined with >5x operations at UCB.

LFC Maintenance Procedure