Subsystem | Status at Pre-Ship Review | Current Status | Outstanding Issues That Affect Operations | Other Outstanding Issues For KPF Team |
---|
Ca H&K Spectrometer | | Trouble with trigger signal to start exposures (troubleshooting underway) Does spectrum need to be moved? Has on-sky throughput been checked?has meant it has not been in regular use On-sky throughput measurement still TBD
| | |
Calibration Unit | Could not fully test the Calibration Unit at SSL since compensator motors had very long lead and were not in-hand. Calibration Unit was set into a state that allowed use but was not the final configuration.
| New plan is to not use motors but purchase filters with higher tolerances. Filter purchase waiting on funding; will install filters during servicing mission. This will make for a simpler system going forward (and one easier to maintain as 4 less motors involved, no look-up table to maintain)
| | |
LFC | | | | |
Etalon | | | | |
Cryostats/CCDs | Fully passed majority of requirements Fringing was significantly worse than requirement, plan was to correct in software
| Has fringing correction been looked at yet? (science impact not operational) CTE issue on one Green quadrantSome fixed-noise patterns on CCDs caused by insufficient grounding Charge Transfer Efficiency (CTE) issue on one quadrant of Green CCD Fringing patttern still present
| | |
Environmental Control System | | Thermal enclosure to be installed later this year. Linear potentiometers not in regular use (will be re-initialized during servicing mission) Gate valve position monitoring not yet implemented (will occur during servicing mission)
| | Servicing mission items: |
Exposure Meter | | | | Test using the Exposure Meter in an automated way to terminate an exposure at the correct signal-to-noise ratio. Andrew looking into exposure meter throughputDetermine on-sky throughput (and compare to main spectrometer)
|
Fiber Injection Unit | •Optical performance and alignment requirements met | | On-sky acquisition and guiding requirements met? – check list sent to Josh for CAPS FVCs have been more challenging to use than expected. ADC prism counter-rotation offsets likely not correct
| |
Optical Fibers | •All requirements met | | | |
Agitator | •Was not tested at SSL | | | |
Instrument Control Software | •Nearly all dispatchers written (only exposure meter, LFC, and etalon TBC) •Minimal alarms in place | | | Update: All dispatchers now operational “testall” script operational and in use Alarm system fully functional with important alarms in place
To-do: |
Observing GUI | | | | |
Spectrometer | | | | |
SoCal | | | | |