Most of these were one-time procedures, and will not need to be repeated. However, they are collected here for future reference.
Description | Procedure | Notes | ||||
---|---|---|---|---|---|---|
Archon XVBias Board Removal |
| Performed on the Green Archon after XVBoard started failing. The XVBias board is only needed for the thicker (100um) STA devices; since both KPF CCDs are 30um-thick it can be removed. Note the Red Archon also has this board installed but it has not been removed as of June 2023. | ||||
Backup Computer Network Connections |
| Instructions on how to connect the KPF backup computer to the WMKO ops network. | ||||
Archon Grounding Strap Installation |
| The Archons were showing some fixed-pattern noise. This occurred at SSL and was fixed with better grounding of the Archons. These instructions show how to better ground the Archons to the vacuum chamber. | ||||
Ca HK Trigger Measurements |
| |||||
HK Galil Voltage Divider - Resistor Cahnge |
| |||||
Etalon Computer Re-Install |
| Connections for the etalon computer to be re-installed after it was at headquarters for the WMKO OS install. | ||||
LFC Computer Network Change |
| The LFC was originally on the ops network; these instructions explained how to move it to the KPF Private Network. This change was made and it is now on the KPF Private Network. | ||||
“Motor Off” Jumper Install for Optical Bench Isolator Motor Galil |
| This jumper prevents the motors from turning on inadvertently when the Galil is powered on. This has been completed. | ||||
Exposure Meter Shelf - Assembly Details |
|
...