Provided here is the list of maintenance procedure that KPF itemized at the Pre Ship Review.

Maintenance Procedure

Lead

Document

Notes

Scrambler Alignment Procedure

M. Sirk & S. Jelinsky

Reformatter Fiber Block Installation Procedure

Winlight

Released

Agitator General Maintenance Procedure

M. Sirk

Agitator Reel Removal Procedure

S. Gibson

Spectrograph Installation Procedure

K. Rider

TBC

Outline document generated, procedure refined with 3x operations at UCB.

Spectrograph Removal Procedure

K. Rider

TBC

Outline document generated, procedure refined with 3x operations at UCB.

Chamber Pump-down Procedure

K. Rider

TBC

Outline document generated, procedure refined with >5x operations at UCB.

Chamber Vent Procedure

K. Rider

TBC

Outline document generated, procedure refined with >5x operations at UCB.

Scrambler Source-Select Shutter Replacement Procedure

S. Gibson

Scrambler Sci/Sky (Timed) Shutter Replacement Procedure

S. Gibson

Hollow Cathode Lamp Replacement
Procedure

S. Gibson

Cal Unit Alignment Procedure

S. Gibson & S. Halverson

TBC

Waiting for upgraded filters. Will generate procedure during filter installation.

Etalon Maintenance Procedure

C. Schwab

TBC

Not yet started

Detector Cool-down Procedure

K. Rider

TBC

Outline document generated, procedure refined with >5x operations at UCB.

Detector Warm-up Procedure

K. Rider

TBC

Outline document generated, procedure refined with >5x operations at UCB.

LFC Maintenance Procedure

Menlo Systems

TBC

A maintenance training session with Menlo is part of our contract but has not happened yet.


Other Procedures

Various notes sent to summit staff from the KPF team regarding adjustments or changes.

Most of these were one-time procedures, and will not need to be repeated. However,

they are collected here for reference.

Description

Procedure

Notes

Archon XVBias Board Removal

Performed on the Green Archon after XVBoard started failing.

The XVBias board is only needed for the thicker (100um) STA devices; since both KPF CCDs are 30um-thick it can be removed.

Note the Red Archon also has this board installed but it has not been removed as of June 2023.

Backup Computer Network Connections

Instructions on how to connect the KPF backup computer to the WMKO ops network.

Archon Grounding Strap Installation

The Archons were showing some fixed-pattern noise. This occurred at SSL and was fixed with better grounding of the Archons. These instructions show how to better ground the Archons to the vacuum chamber.

Ca HK Trigger Measurements

HK Galil Voltage Divider - Resistor Cahnge

Etalon Computer Re-Install

Connections for the etalon computer to be re-installed after it was at headquarters for the WMKO OS install.

LFC Computer Network Change

The LFC was originally on the ops network; these instructions explained how to move it to the KPF Private Network. This change was made and it is now on the KPF Private Network.

“Motor Off” Jumper Install for Optical Bench Isolator Motor Galil

This jumper prevents the motors from turning on inadvertently when the Galil is powered on. This has been completed.

Exposure Meter Shelf - Assembly Details