Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

No additional power cycling capabilities needed.

Power Outage Procedure

  • Shut down instrument software in preparation for powering things off

    • Run CSUSTOP

    • Ensure detector is put to bed gently

  • Go to low power mode by turning off components in the electronics cabinet

    • Power down these components:

      • CSU Controller

      • CSU Drives

      • Jade 2

      • Computer

      • Ne lamp

      • Ar lamp

      • Guider focus galil

      • Guider camera electronics (these prevent frost on guider, so probably need to leave these on?)

      • Motor box

      • FCS controller

    • This leaves telemetry active (needs mosfireserver and vm-mosfire)

      • Could shut down Kaimana?