Procedure Before power down

  • Sherry will power off and warm both detectors to 80K after the Nov 3 science run.

  • Run osirisDisconnect in the morning on Nov 6 before the power shutdown.

  • On Nov 4: Sherry run osirisStartWarmup to
    set both detector target temperatures to 80K
    lock all the mechanisms
    start temperature and pressure logging
    keep detectors powered on by
    oids.powerdown=0 and osds.powerdown=0

  • On Nov 6, by 9 am: Sherry power off spec and imag detectors by oids.powerdown=1 and osds.powerdown=1, then run osirisDisconnect

  • On Nov 6, IT turn off:
    osiris-drp
    vm-osiris
    osirisimag
    osirisspec
    osirisserver
    osiris-control2
    osiris-control1

Procedure during the power down

...

Procedure to bring back the system

  • IT Bring up napili (osirisserver) first, then puunoa (spec target computer), kuiaha (imag target computer), olowalu (osirisdrp) :
    osiris-control1
    osiris-control2
    osirisserver
    osirisspec
    osirisimag
    vm-osiris
    osiris-drp

  • If the computers are up:

    • Sherry will run osirisConnect which will power on instrument, start servers, and checks out detectors.