...
Procedure Before power down
Sherry will power off and warm both detectors to 80K after the Nov 3 science run.
Run
osirisDisconnect
in the morning on Nov 6 before the power shutdown.
On Nov 4: Sherry run
osirisStartWarmup
to
set both detector target temperatures to 80K
lock all the mechanisms
start temperature and pressure logging
keep detectors powered on byoids.powerdown=0
andosds.powerdown=0
On Nov 6, by 9 am: Sherry power off spec and imag detectors by
oids.powerdown=1
andosds.powerdown=1
, then runosirisDisconnect
On Nov 6, IT turn off:
osiris-drp
vm-osiris
osirisimag
osirisspec
osirisserver
osiris-control2
osiris-control1
Procedure during the power down
...
Procedure to bring back the system
IT Bring up
napili
(osirisserver) first, thenpuunoa
(spec target computer),kuiaha
(imag target computer),olowalu
(osirisdrp) :
osiris-control1
osiris-control2
osirisserver
osirisspec
osirisimag
vm-osiris
osiris-drpIf the computers are up:
Sherry will run
osirisConnect
which will power on instrument, start servers, and checks out detectors.Sherry will check mechanism health, and then power on and cool down both detectors.