  • IT Bring up:
    osiris-control1
    osiris-control2
    osirisserver
    osirisspec
    osirisimag
    vm-osiris
    osiris-drp

  • If the computers are up:

    • Sherry will run osirisConnect which will power on instrument, start servers, and checks out detectors.Sherry will check mechanism health, and then power on and cool down both detectors.the lakeshores and instrument

    • Sherry will run osirisStartCooldown to set spec and imag detector target temperature to 72K and 70K

    • Summit turns on CCR

    • Sherry checks if the heaters for spec and imag detectors are up and running and keep both detectors at target temperature . It will likely take more work to bring up the spec detector heater, see Kd1-32369