IT Bring up:
osiris-control1
osiris-control2
osirisserver
osirisspec
osirisimag
vm-osiris
osiris-drpIf the computers are up:
Sherry will run
osirisConnect
which will power on instrument, start servers, and checks out detectors.Sherry will check mechanism health, and then power on and cool down both detectors.the lakeshores and instrumentSherry will run
osirisStartCooldown
to set spec and imag detector target temperature to 72K and 70KSummit turns on CCR
Sherry checks if the heaters for spec and imag detectors are up and running and keep both detectors at target temperature . It will likely take more work to bring up the spec detector heater, see Kd1-32369