Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

2020-05-21. Night 1 Engineering Proposal (this is ambitious)

...

UTStart

...

Duration (hh:mm)

...

Test

...

complet

...

05:04

...

00:15

...

Sunset/Dome open

...

05:19

...

02:00

...

PCS: fine screen, phasing

...

07:20

...

00:10

...

Switch to OSIRIS

...

07:30

...

00:30

...

Basic AO/OSIRIS checkout

Stability

IQ on bright star

...

08:00

...

01:00

...

OSIRIS HAM Check

HD 90700 (single)

HD 90823 (double)

...

09:00

...

01:00

...

OSIRIS post-service

Server functionality post OS upgrade

Orientation

Offsets between OSPEC/OSIMG

Offsets between OSPEC scales

...

10:00

...

01:00

...

OSIRIS Tellurics w/ & w/o TRICK dichroic

Mostly SPEC

Simultaneous IMAG if can

...

11:00

...

01:00

...

OSIRIS blank sky for wavelength solution

...

12:00

...

01:00

...

Repeat Tellurics or Imager throughputs as function of pupil

...

13:00

...

00:10

...

Switch to SSC

...

13:10

...

00:50

...

45-star pointing test CW

...

14:00

...

00:50

...

45-star pointing test CCW

...

14:52

...

-

...

12-degree twilight

...

15:33

...

-

...

Sunrise

2020-05-22. Night 2

...

StartUT

...

Duration

...

Test

...

complete

...

05:04

...

00:16

...

Sunset/Open Dome

...

05:20

...

01:00

...

MOSFIRE on-sky

...

06:20

...

00:10

...

Switch to OSIRIS

...

06:30

...

00:45

...

LGS checkout

...

07:15

...

01:00

...

KAPA laser optimization

Wavelength

Polarization

Intensity

Background w/ detuning

...

08:15

...

02:00

...

KAPA laser performance

Spot size vs. El

Pointing

...

10:15

...

03:00

...

KAPA LGS performance

Imag IQ vs TT Rmag, EL

SPEC IQ vs TT Rmag, EL

Ref NGS measurement

...

13:15

...

01:37

...

TRICK functionality on GC

...

14:52

...

-

...

12 degree twilight

...

15:33

...

-

...

Sunrise

 

2020-05-23. Night 3

...

StartUT

...

Duration

...

Test

...

complete

...

05:05

...

00:15

...

Sunset/Open Dome

...

05:20

...

01:00

...

HIRESr on-sky

...

06:20

...

00:10

...

Switch to OSIRIS

...

06:30

...

01:00

...

LGS checkout

...

07:30

...

01:30

...

LBWFS Tests

New LBImgAcq

New LBMngr

...

09:00

...

03:00

...

KAPA LGS Performance

IQ vs mag

IQ vs off-axis distance

IQ vs framerate

IQ vs r0

Ref NGS measurement

Dither performance

...

12:00

...

02:51

...

LIFT w/ TRICK

...

14:51

...

-

...

12 degree twilight

...

15:33

...

-

...

Sunrise

...

As part of the UNO project, all WMKO instruments will need to have the capability for power cycling various sub-systems that have previously relied on physical presence at the summit.