2020-05-21. Night 1 Engineering Proposal (this is ambitious)
UTStart | Duration (hh:mm) | Test | complet |
05:04 | 00:15 | Sunset/Dome open | |
05:19 | 02:00 | PCS: fine screen, phasing | |
07:20 | 00:10 | Switch to OSIRIS | |
07:30 | 00:30 | Basic AO/OSIRIS checkout Stability IQ on bright star | |
08:00 | 01:00 | OSIRIS HAM Check HD 90700 (single) HD 90823 (double) | |
09:00 | 01:00 | OSIRIS post-service Server functionality post OS upgrade Orientation Offsets between OSPEC/OSIMG Offsets between OSPEC scales | |
10:00 | 01:00 | OSIRIS Tellurics w/ & w/o TRICK dichroic Mostly SPEC Simultaneous IMAG if can | |
11:00 | 01:00 | OSIRIS blank sky for wavelength solution | |
12:00 | 01:00 | Repeat Tellurics or Imager throughputs as function of pupil | |
13:00 | 00:10 | Switch to SSC | |
13:10 | 00:50 | 45-star pointing test CW | |
14:00 | 00:50 | 45-star pointing test CCW | |
14:52 | - | 12-degree twilight | |
15:33 | - | Sunrise |
2020-05-22. Night 2
StartUT | Duration | Test | complete |
05:04 | 00:16 | Sunset/Open Dome | |
05:20 | 01:00 | MOSFIRE on-sky | |
06:20 | 00:10 | Switch to OSIRIS | |
06:30 | 00:45 | LGS checkout | |
07:15 | 01:00 | KAPA laser optimization Wavelength Polarization Intensity Background w/ detuning | |
08:15 | 02:00 | KAPA laser performance Spot size vs. El Pointing | |
10:15 | 03:00 | KAPA LGS performance Imag IQ vs TT Rmag, EL SPEC IQ vs TT Rmag, EL Ref NGS measurement | |
13:15 | 01:37 | TRICK functionality on GC | |
14:52 | - | 12 degree twilight | |
15:33 | - | Sunrise |
2020-05-23. Night 3
StartUT | Duration | Test | complete |
05:05 | 00:15 | Sunset/Open Dome | |
05:20 | 01:00 | HIRESr on-sky | |
06:20 | 00:10 | Switch to OSIRIS | |
06:30 | 01:00 | LGS checkout | |
07:30 | 01:30 | LBWFS Tests New LBImgAcq New LBMngr | |
09:00 | 03:00 | KAPA LGS Performance IQ vs mag IQ vs off-axis distance IQ vs framerate IQ vs r0 Ref NGS measurement Dither performance | |
12:00 | 02:51 | LIFT w/ TRICK | |
14:51 | - | 12 degree twilight | |
15:33 | - | Sunrise |