  • Summit turn on CCR

  • IT Bring up:
    osirisserver
    osiris-control1
    osiris-control2
    osirisspec
    osirisimag
    vm-osiris
    osiris-drp

  • If the computers are up:

    • Sherry will run osirisConnect which will power on the lakeshores and instrument
      osiris-control1
      osiris-control2
      will be connected after osirisConnect is complete.

    • Sherry will run osirisStartCooldown to set spec and imag detector target temperature to 72K and 70K

    • Sherry checks if the heaters for spec and imag detectors are up and running and keep both detectors at target temperature . It will likely take more work to bring up the spec detector heater, see Kd1-32369