  • On Nov 4: Sherry run osirisStartWarmup to
    set both detector target temperatures to 80K
    lock all the mechanisms
    start temperature and pressure logging
    keep detectors powered on by
    oids.powerdown=0 and osds.powerdown=0

  • On Nov 6, by 9 8:30 am: Sherry power off spec and imag detectors by oids.powerdown=1 and osds.powerdown=1, then run osirisDisconnect

  • On Nov 6, IT turn off:
    osiris-drp
    vm-osiris
    osirisimag
    osirisspec
    osirisserver
    osiris-control2
    osiris-control1
    osirisserver

  • On Nov 6, summit turn off CCR right before 9:30

Procedure during the power down

...

Procedure to bring back the system

  • Summit turn on CCR

  • IT Bring up:
    osiris-control1
    osiris-control2
    osirisserver
    osirisspec
    osirisimag
    vm-osiris
    osiris-drp

  • If the computers are up:

    • Sherry will run osirisConnect which will power on instrument, start servers, and checks out detectors.Sherry will check mechanism health, and then power on and cool down both detectors.the lakeshores and instrument
      osiris-control1
      osiris-control2
      will be connected after osirisConnect is complete.

    • Sherry will run osirisStartCooldown to set spec and imag detector target temperature to 72K and 70K

    • Sherry checks if the heaters for spec and imag detectors are up and running and keep both detectors at target temperature . It will likely take more work to bring up the spec detector heater, see Kd1-32369