Date
Participants
Goals
Discussion topics
Time | Item | Presenter | Notes |
---|---|---|---|
Design of the observing design tool | Tyler | ||
Instrument Tech / Engineer Coverage | |||
VNC connection monitor process (noc2). Do we need it? |
Time | Item | Presenter | Notes |
---|---|---|---|
Design of the observing design tool | Tyler | ||
Instrument Tech / Engineer Coverage | |||
VNC connection monitor process (noc2). Do we need it? |