Sub-system PDUs (needed and/or already installed)

Sub-system

Function

Physical Location

Status

Keyword Control

CCD controller power supply

CCD control crate

Footlocker inside HIRES enclosure. Power cord goes through wall into Old K1 laser enclosure.

PDU Installed:

…48G-K1Laser …82.54 port 28

PDU: KB_A1

needs implementation

Fan Control

Cooling for CCD controller

Footlocker in HIRES enclosure. This is part of the same power cable for the Footlocker. Single PDU connects both.

<add additional picture>

PDU Installed

(same one as footlocker):

…48G-K1Laser …82.54 port 28

PDU:KB_A1

needs implementation

Motor Control crate power supply

Motor control Crate

Old K1 laser enclosure on K1 Platform

<add photo of plug going to PDU>

PDU Installed:

…48G-K1Laser 192.168.82.54 port 26

PDU: KB_A3

needs implementation

Exposure Meter

Separate system used for controlling exposure time to achieve a desired S/N

Old K1 laser enclosure on K1 Platform

PDU Installed:

KA_A6

needs implementation

Terminal Server

For access to the motor crate

Old K1 laser enclosure on K1 Platform

<add new photo>

PDU Installed:

KA_A1

needs implementation

Fiber Converter

Fiber to/from ethernet conversion

Old K1 laser enclosure on K1 Platform

<add pic>

PDU Installed:

KA_A4

needs implementation

Serial Converter

Fiber to/from serial conversion

Old K1 laser enclosure on K1 Platform

<add pic>

PDU Installed:

KA_A5

needs implementation

Ethernet Converter

10Base2 to/from ethernet converter

<last pix, shows white box>

HIRES server (“lehoula”)

Main computer server for the instrument

K1 computer room

PDU installed (Jet Dee)

TBD

 