Sub-system PDUs (needed and/or already installed)
Sub-system | Function | Physical Location | Status | Keyword Control |
CCD controller power supply | CCD control crate | Footlocker inside HIRES enclosure. Power cord goes through wall into Old K1 laser enclosure. | PDU Installed: …48G-K1Laser …82.54 port 28 | needs implementation |
Fan Control | Cooling for CCD controller | Footlocker in HIRES enclosure. This is part of the same power cable for the Footlocker. Single PDU connects both. | PDU Installed (same one as footlocker): …48G-K1Laser …82.54 port 28 | needs implementation |
Motor Control crate power supply | Motor control Crate | Old K1 laser enclosure on K1 Platform | PDU Installed: …48G-K1Laser 192.168.82.54 port 26 | needs implementation |
Galil controllers | Mechanism control | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Amplifiers | Needed for mechanism control | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Interconnect | Also needed for mechanism control | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Exposure Meter | Separate system used for controlling exposure time to achieve a desired S/N | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Terminal Server | For access to the control crates | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Ethernet Converter | Fiber to/from ethernet conversion | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
Serial Converter | Fiber to/from serial conversion(?) | Old K1 laser enclosure on K1 Platform | PDU Needed | needs implementation |
“Cylinder control” | Unknown what this is or does. Has a sticker on it saying “HIRES” | Old K1 laser enclosure on K1 Platform. This has its own separate outlet | PDU Needed | needs implementation |
HIRES server (“lehoula”) | Main computer server for the instrument | K1 computer room | PDU installed (Jet Dee) | TBD |