Battery need

  • Prefer to keep both spectrograph and imager Lakeshore powered up with UPSs

Procedure Before power down

  • Sherry will power off and warm both detectors to 80K after the Nov 3 science run.

Procedure during the power down

None

Procedure to bring back the system

  • Bring up napili (osirisserver) first, then puunoa (spec target computer), kuiaha (imag target computer), olowalu (osirisdrp)

  • If the computers are up:

    • Sherry will run osirisConnect which will power on instrument, start servers, and checks out detectors.

    • Sherry will check mechanism health, and then power on and cool down both detectors.

  • No labels