\uD83D\uDDD3 Date

\uD83D\uDC65 Participants

\uD83E\uDD45 Goals

\uD83D\uDDE3 Discussion topics

Time

Item

Presenter

Notes

13:00

Words from Jim

Jim

  • Jim may be remote (or miss) this meeting (vaxes previous evening)

  • Mentor for HPA senior?

  • Leo starts Nov 11, think about training plan

Words from John

John

K1 Az wrap

Jim/Carolyn

  • K1 overtravel damaged Az cable wrap 9/20

  • No one hurt

  • Quick action by Eric/TonyR prevented serious damage

  • Put back in place 9/21

  • Incident investigation ongoing

Summit power shutdown

Jim/All

  • Summit automatic transfer switch (ATS) and breaker replacement scheduled for Nov 6/7 (install/test)

  • Full power off on summit for up to 2 hours

  • What are the instrument risks?

  • Will write up for decision makers

Percy may not be able to make this, but gave some thoughts:

  1. Risk of troubles while booting a system will delay the power on of Lakeshores or other temperature controllers

  2. While normally robust to comms issues, perhaps a Lakeshore comes up incorrectly

  3. Would greatly prefer to have a UPS

  4. Is there a specific order to bring servers up for each instrument? Does booting a server also bring up the software automatically?

Cal Association

MaxB

For new instruments, what are the

  • Minimum cals

  • Calibration association ideas

  • Loaded Q: what about existing instruments?

KSM download

All

  • So, anything interesting happen?

New Slitmask Database Webpage

Michael

✅ Action items

  •  

⤴ Decisions