Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Program

Instrument(s)

Estimated time

SA and other staff involved

Science verification of DEIMOS polo migration to Linux and rotator controller upgrade. Test GUIs and operation scripts on sky with a DEIMOS observer.

DEIMOS

Two 0.5 nights separated by two weeks.

C. Alvarez.

S. Kwok, K. Lanclos and W. Deich (UCSC) on call.

Solid on-sky time with TRICK NGS and LGS, smooth out all TRICK’s edges. Observe a wide range of targets, e.g. point sources, faint extended sources, nonsidereal targets, etc.

OSIRIS

2

PyWFS and SH switch back and forth on sky

NIRC2

NGS-AO performances and stability using 1.0 plate scale for KI and KII

OSIRIS NIRC2

NIRES engineering:
daytime:

  1. slit-viewing camera guiding work 24 hours (need cold NIRES, no tel access)

  2. spectral flexure 8 hours (full tel access)

night time:

  1. optical guider flexure 2 hours

  2. throughput measurements 0.5 hours

  3. slit-viewing guiding 2 hours

NIRES

5 hours

P. Gomez (all)

M. Baril (daytime 1)

S. Kwok (night time 3)

K. Laclos (daytime 1)

A. Rostopchina (night time 1)