Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 7 Next »

Program

Instrument(s)

Estimated time

SA and other staff involved

Science verification of DEIMOS polo migration to Linux and rotator controller upgrade. Test GUIs and operation scripts on sky with a DEIMOS observer.

DEIMOS

Two 0.5 nights separated by two weeks.

C. Alvarez.

S. Kwok, K. Lanclos and W. Deich (UCSC) on call.

Solid on-sky time with TRICK NGS and LGS, smooth out all TRICK’s edges. Observe a wide range of targets, e.g. point sources, faint extended sources, nonsidereal targets, etc.

OSIRIS

2

PyWFS and SH switch back and forth on sky

NIRC2

NGS-AO performances and stability using 1.0 plate scale for KI and KII

OSIRIS NIRC2

NIRES engineering:
daytime:

  1. slit-viewing camera guiding work 24 hours (need cold NIRES, no tel access)

  2. spectral flexure 8 hours (full tel access)

night time:

  1. optical guider flexure 2 hours

  2. throughput measurements 0.5 hours

  3. slit-viewing guiding 2 hours

NIRES

5 hours

P. Gomez (all)

M. Baril (daytime 1)

S. Kwok (night time 3)

K. Laclos (daytime 1)

A. Rostopchina (night time 1)

  • No labels