PSR Requirements SummaryStatus at Pre-Ship Review | Current Status | Outstanding Issues That Affect Operations | Outstanding Issues For KPF Team |
---|
Ca H&K Spectrometer |
•Met requirements •(Throughput was calculated not measured) | •Trouble •Has on been checked?•Does spectrum need to be moved?•Could •Calibration •Plan at PSR was to install compensating motors to account for filter wedge angle differences causing mis-alignments
•New tolerances and avoid using motors. Filter purchase waiting on funding; will install filters during servicing mission. as less , •Lamp issues, power supply issues (now perhaps solved with supplies?)•Was | Servicing mission items: |
LFC | | |
Etalon | •Is this our final etalon? Plans for a replacement?•SuperK failing
Current etalon has been used regularly though the Doppler stability is not well tested over long periods because the other testing sources have had irregular availability during the past month or so. Initial results are promising on the < 1 day timescale. However etalon light source (SuperK) is failing or moving out of alignment
| | |
Cryostats/CCDs |
•Passed .•Some •Fringing Noise issues (procedure in-hand for better grounding)Has fringing correction been looked at yet? (science impact not operational)
CTE issue on one Green quadrant
| Some fixed-noise patterns on CCDs caused by insufficient grounding A new charge Transfer Efficiency (CTE) issue on one quadrant of Green CCD Fringing pattern still present Ion pump issue still present
| | Change readout mode on Green CCD to avoid CTE issue Investigate ways to minimize fringing impact within DRP Hardware fix for ion pump issue during servicing mission
|
Environmental Control System |
•Vacuum •Thermal •
•Nearly Linear potentiometers not in regular use Gate valve position monitoring not yet implemented | Exposure Meter | •Met requirements •(Throughput was calculated not measured) | •Have we checked this? “The flux at the EM detector shall be at minimum 1% of the flux at the main spectrometer CCD” •Above also needed for automatic exposure termination •Has that been done tried yet?? |
Fiber Injection Unit | •Optical performance and alignment requirements met | •On-sky acquisition and guiding requirements met? – check list sent to Josh for CAPS •FVCs have been challenging •ADC prism counter-rotation offsets likely not correct |
Optical Fibers | •All requirements met | • |
Agitator | •Was not tested at SSL | •Has been in routine operation on the summit •Have we done an agitator on / agitator off test?? |
Instrument Control Software | | | Servicing mission items: Install thermal enclosure bring linear potentiometers online (these provide bench position feedback) bring gate valve position feedback online
|
Exposure Meter | | | | |
Fiber Injection Unit | | Centering stars on fibers is difficult to measure and likely not meeting the requirements ADC performance is difficult to measure precisely and is likely not meeting the requirements FVCs have been more challenging to use than expected Prisms within Science arm ADC appear to not be set correctly. Detailed discussion in /wiki/spaces/KPF/pages/1537441840 and /wiki/spaces/KPF/pages/1537671297
| | |
Optical Fibers | | | | |
Agitator | | | | |
Instrument Control Software | |
•Minimal •All •“testall” operational (and ?)•Alarm systems •Plan to add more alarms
•Archon trigger issues
•Backup computer still TBD
•with important alarms in place Archon has occasional trigger-signal issues Backup computer is installed at summit but not operational (needs OS installed)
| | |
Observing GUI |
•Sketches •Fully operational?? | Spectrometer | •Met requirements •(Throughput was calculated not measured) | •Throughput | | | |
Spectrometer | | Fiber block in reformatter is slightly out of alignment Green channel focus is soft in one corner of CCD Flat field fiber system needs slight realignment
| | |
•Current thought – this is the ADC correction being offSoCal |
SoCal | | | | |
LN2 Autofill System | | Initial tests showed major heat losses within transfer plumbing and GN2 back-pressure issues which negatively impacted dewar fills, and introduced significant thermal transients in the spectrometer System was re-designed to correct these issues Autofill system now in regular use, and KPF dewars are filled from supply dewars located in K2 machinery room
| Need an automated, daily check that fills have completed successfully and sends out alerts if not. Swapping 180 liter supply dewars every other day represents unanticipated labor. Maintenance of LN2 plumbing (vac lines, solenoids) Potential need to purge KPF LN2 lines if ice accumulation issue has not been solved.
| |