Subsystem | Requirements | Notes |
---|---|---|
Fiber Injection Unit | Updates after iterations with WMKO. This version was used for the FIU PDR. | |
Green and Red CCDs | Post CCD testing | |
Vacuum Chamber | Version from MRR | |
Exposure Meter Requirements | ||
Calcium H&K Spectrometer | ||
Scrambler | ||
Agitator | ||
Data Reduction Pipeline | Updated for DRP review. | |
Detector Cryostats | ||
Spectrometer Requirements | ||
SoCal |
General
Content
Integrations
Add Comment