/
K1. Engineering

K1. Engineering

2020-05-21. Night 1 Engineering Proposal (this is ambitious)

UTStart

Duration (hh:mm)

Test

complet

05:04

00:15

Sunset/Dome open

 

05:19

02:00

PCS: fine screen, phasing

 

07:20

00:10

Switch to OSIRIS

 

07:30

00:30

Basic AO/OSIRIS checkout

Stability

IQ on bright star

 

08:00

01:00

OSIRIS HAM Check

HD 90700 (single)

HD 90823 (double)

 

09:00

01:00

OSIRIS post-service

Server functionality post OS upgrade

Orientation

Offsets between OSPEC/OSIMG

Offsets between OSPEC scales

 

10:00

01:00

OSIRIS Tellurics w/ & w/o TRICK dichroic

Mostly SPEC

Simultaneous IMAG if can

 

11:00

01:00

OSIRIS blank sky for wavelength solution

 

12:00

01:00

Repeat Tellurics or Imager throughputs as function of pupil

 

13:00

00:10

Switch to SSC

 

13:10

00:50

45-star pointing test CW

 

14:00

00:50

45-star pointing test CCW

 

14:52

-

12-degree twilight

 

15:33

-

Sunrise

 

 


2020-05-22. Night 2

StartUT

Duration

Test

complete

05:04

00:16

Sunset/Open Dome

 

05:20

01:00

MOSFIRE on-sky

 

06:20

00:10

Switch to OSIRIS

 

06:30

00:45

LGS checkout

 

07:15

01:00

KAPA laser optimization

Wavelength

Polarization

Intensity

Background w/ detuning

 

08:15

02:00

KAPA laser performance

Spot size vs. El

Pointing

 

10:15

03:00

KAPA LGS performance

Imag IQ vs TT Rmag, EL

SPEC IQ vs TT Rmag, EL

Ref NGS measurement

 

13:15

01:37

TRICK functionality on GC

 

14:52

-

12 degree twilight

 

15:33

-

Sunrise

 

 


2020-05-23. Night 3

StartUT

Duration

Test

complete

05:05

00:15

Sunset/Open Dome

 

05:20

01:00

HIRESr on-sky

 

06:20

00:10

Switch to OSIRIS

 

06:30

01:00

LGS checkout

 

07:30

01:30

LBWFS Tests

New LBImgAcq

New LBMngr

 

09:00

03:00

KAPA LGS Performance

IQ vs mag

IQ vs off-axis distance

IQ vs framerate

IQ vs r0

Ref NGS measurement

Dither performance

 

12:00

02:51

LIFT w/ TRICK

 

14:51

-

12 degree twilight

 

15:33

-

Sunrise

 

 









Related content

UNO readiness for Instruments
UNO readiness for Instruments
Read with this
Engineering ideas
Engineering ideas
More like this
HIRES Readiness
HIRES Readiness
Read with this
SA Input to TLT for 5-year Plan (Jan 2025)
SA Input to TLT for 5-year Plan (Jan 2025)
More like this
Science ideas
Science ideas
More like this
Subsystem Development - Lead Institutions
Subsystem Development - Lead Institutions
More like this