2022-07-07 Meeting notes

2022-07-07 Meeting notes

 Date

Jul 7, 2022

 Participants

  • @Josh Walawender@Kyle Lanclos @Carolyn Jordan @Percy Gomez

  • @Randy Campbell @sherry yeh @Michael Lundquist @Jim Lyke @Max Service @Chien-Hsiu Lee (Unlicensed) @Rosalie McGurk

 Goals

  •  

 Discussion topics

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

1:05

Words from Randy

Randy

  • From council

    • looking back at last few years and see how council has executed promises

    • Recruiting: now much more efficient, now nearly fully staffed

    • Retention: communication, compensation, onboarding. More focussed effort there.

    • Gallup survey of staff didn’t go anywhere, now out of date

    • Looking at other survey options

    • Rosalie: is this instead of a “climate survey”?

    • Randy: this was the Gallup survey, but dropped when Roy left

    • Looking in to ways to listen to staff. Gretchen has used “tiny pulse” (sp?) tool.

    • Jim: have we created salary imbalances by quickly staffing up?

    • Randy: have looked at that and made adjustments.

    • Jim: performance reviews, haven’t done in a while. Have changed systems a lot. Is that being looked at?

    • Randy: yes, being looked at, going to be brief, easy, simple, focussed on goals. Keep track star, but refactor it.

  • Aug and Sept support schedule draft out, please review

  • Keck Science Meeting

    • Will try to send as many SAs as possible, emphasis on new SAs

1:16

22B sched and projects

Randy

discuss some of the upcoming challenges with phasing of all the projects, AO, KRCM, KPF, OSIRIS service, NIRC2, LRIS, LFC, etc.

  • Lots going on this 22B semester

  • Also NIRES guider upgrade (August)

    • FYI Shui just left for a month

  • Marc and Jeff have submitted FY23 plans for instruments, DSI, KOA = lots of hours

  • KCRM is likely slipping in to 23A. Just shipped camera optics to CalTech, then at CalTech for 3 month, then ship to us.

  • OSIRIS

    • Begin warmup on 9/5, Begin service on 9/15, begin pumping 9/18, begin cooldown 9/28, K1 eng starting around 10/8

  • KPF

    • Lots of FIU install work in July and August

    • FIU realigned in lab this week

    • FVCs do appear to work thanks to realignment

    • Main spectrograph shipment going out soon, be here late July depending on shipping details

    • Have plan for July & August AO access balancing OSIRIS, KPF FIU, and RTC/KAPA

  • NIRC2 detector electronics upgrade

    • Replace transputers with ARCHON

    • Work being done at Caltech, happening in Fall and Winter

  • Laser Frequency Comb (for NIRSPEC and KPIC)

    • Also an LFC in KPF, some of the KPF IR frequencies may go to NIRSPEC to broaden wavelength range

    • Also happening in this time frame

  • LRIS Refurbishment also in FY23

    • Descoped since LRIS II is now supposed to be a thing

    • LRIS II is maybe 4-5 years away

    • CalTech instrument money will likely help fund LRIS II

  • Other future instruments: LIGER (OSIRIS replacement), HISPEC, SCALES, DEIMOS Detector Upgrade (funded), KWFI

  • Also AO work (Jim says to ostrich it and pretend it’s not there)

1:44

quick focus updates

all

Go around with each SA sharing their focus for the near term, and challenges that need extra support / coordination

  • Josh

    • KPF + DSI, especially the integration of the two

    • Possible SA help: LFC support. Should we merge support of IR LFC and KPF LFC?

    • Going to SPIE

  • Percy

    • NIRES Guider, LRIS service and maintenance of scripts, LRIS polarimeter fix

    • This is now second attempt to repair polarimeter.

    • PypeIt is painful for research, have to rerun everything on updates.

    • Michael is also using PypeIt for LRIS and DEIMOS

    • Sherry: access to local PypeIt machines? Sunil also stuck with LRIS reductions. Talking to Max B. and John.

      • Software groups wants policy before doing this.

      • Primary need is someone to maintain PypeIt install

  • Rosalie

    • Scheduling work for KCWI prior to red side arriving

      • Uses John V., Brett S., and Dwight

    • NIRSPEC support training

  • Chien-Hsiu

    • Learning support for LRIS and ESI

    • AO Summer School in August

    • Doing some work with KOA interfaces

    • Akamai student

    • KPF DRP

  • Max

    • Investigating low bandwidth stability problems

    • Watch pyramid fix to learn about that system

    • Investigating K1 wavefront sensor instability

    • Going to SPIE

  • Jim

    • Both AO systems are “in a state”

    • Going to SPIE

    • Working on AO Ops milestones for next FY

  • Michael

    • Slitmask design tool software. Shui ran in to roadblock in spring. Michael is working on more direct IRAF conversion.

    • KCWI DSI Translator

  • Sherry

    • AO support and troubleshooting

    • Safety plan and JHA for OSIRIS service

    • Shift back to KPF after

    • Away for a few days in August

    • Gone for a while in Nov and December

  • Kyle

    • Tasks which pertain to this group: KPF, specifically the kpfguide system (coordinate systems, guide offloading, etc.).

    • KCWI once it is cabled up and available

  • Randy

    • Scheduling issues. Schedule is more and more complex.

    • When will projects be ready for on sky engineering?

    • Science scheduling with Carolyn, GBS is time consuming

    • Support schedule for next semester

    • Council: annual reviews may start up

    • Going to KSM

    • A lot of support for K1 AO galactic center science coming up

  • Randy and Jim will have science visitor coming, dates TBD. Probably early August. Larissa Takeda (sp?).

2:25

Pau!

 

 

 Action items

 Decisions