KPF Purchase Orders

KPF Purchase Orders

This page contains list of purchase orders, including the KPF spec documents, PO, and deliverables from the vendors.

Some supporting docs may be located at other pages.

Item

Vendor

Date of PO

PO #

Documents

Item

Vendor

Date of PO

PO #

Documents

Thorium and Uranium HCL Lamps

Delta Scientific

July 31, 2020

BB01387735

Scrambler vacuum windows

Lambda Research Optics

June 25, 2020

BB01377686

Scrambler lenses

Ross Optical

June 22, 2020

19289

Quote from Ross (June 22, 2020):  

Updated quote from Ross with the extra 4 lenses:  

Dichroic coating

Materion

 

 

Materion updated quote (May 12, 2020):

Updated Materion Proposal:

Updated Materion Quote:

Updated Materion Schedule:

KPF request for updated quote (May 5, 2020):

Email sent to Materion requesting quote refresh:

Requirements doc sent to Materion:

Drawing sent to Materion:

Primary and Secondary Collimators

Precision Asphere
(now part of II-VI)

April 21, 2020

BB01364029

Requirements docs sent to PA (March 5, 2020):


Drawings sent to PA (March 5, 2020):


"Red" AR coating of VPH grating substrate

PFG Precision Optics

Apr 30, 2019

BB01220215

Spec:  

Updated quote:  

Purchase request:  

Received at SSL Sept 3 2019, inspection report:  

Measured transmission of coating (ridealong witness, pre/post environ testing):  

Wavefront data:  

VPH substrates, 2x

PG&O

Apr 15, 2019

BB01212019

Spec: 

PO:  

First part received at SSL, July 22 and 30, 2019, SN 008:

        PG&O inspection documents:  

        SSL inspection:  

                                   

Second part received at SSL Aug 6 and 13, 2019, SN 007

        PG&O inspection documents:  

        SSL inspection:  

"green" AR coating of grating substrate

PFG Precision Optics

Mar 15, 2019

BB01198479

Spec: 

Updated quote:  

Purchase request:  

Received at SSL Apr 12 2019, inspection report:  

                                                    photos from inspection:  

Measured transmission of coating, and prelim wavefront data:  

Reformatter

Winlight

Dec 6, 2018

BB01156851

see Reformatter page    - for proposal and spec documents

Green VPH grating

KOSI

Nov 20, 2018

 

see VPH grating page    - for proposal and spec documents

VPH substrates (green only), 6x

PG&O

Nov 6, 2018

BB01144273

-    spec drawing

    - purchase order

First 4x parts received at SSL Mar 8 2019:

        PG&O inspection documents:  

        SSL inspection, summary slides:  

        SSL inspection, detailed report: 

Last 2x parts received at SSL Mar 15 2019:

        PG&O inspection documents:  

        SSL inspection, summary slides:  

        SSL inspection, detailed report:  

Echelle Grating

Newport RGL

Dec 27, 2016

BB00832441

see Echelle page    - for proposal, spec documents, PO, vendor final report

ETU Shims

Mindrum

Mar 27, 2017 (24x)

Sept 19, 2017 (5x more)

BB00873739

- quote 3/30/17

  - sent to Mindrum for quote

  - sent to Mindrum for quote

Mindrum order acknowledgements:

Mindrum order acknowledgement - spherical shims
Mindrum order acknowledgement - flat shims

Dichroic Substrate

Bond Optics

 

 

Drawing: