2023-12-07 Meeting notes

2023-12-07 Meeting notes

 Date

Dec 7, 2023

 Participants

  • @Josh Walawender@Carlos Alvarez @Kyle Lanclos @Maylyn Caravalho (Unlicensed) @Chien-Hsiu Lee (Unlicensed) @Max Service @Percy Gomez

  • @Greg Doppmann @Rosalie McGurk @Jim Lyke @Michael Lundquist @Grant Hill@Marc Kassis Arina

 Goals

  •  

 Discussion topics

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

1:03

Words from Randy

Randy

  • Expectation on director search is that the new director should be named in the next few weeks. It is in the board’s hands. They’ve done their interviews.

  • Reminder to charge time to instrument maintenance when appropriate. Remind others to do the same (software, summit etc.).

  • Also charge to appropriate CI project when appropriate

  • Grant: summit staff should also use RaP project per instrument codes for certain tasks

  • Randy will be working on 24A support schedule toward end of Dec, so get support block out dates in.

1:10

UNO Documentation and Training Needs

Josh

Draft list from Josh:

  • VWA and cameras.

    • How do we access VWA cameras?

    • How do we troubleshoot?

  • A complete and detailed run down on the day crew’s departure criteria under the UNO scheme.

  • Event Notifier training

    • Should instruments be put in that?

  • A complete and detailed run down on the new OA procedures for safely handling remote ops and how it might affect night time operations.

  • Power outage procedures, so we can understand how they will affect instruments.

    • What happens when no one is on the summit?

    • When are things powered down? Who does it?

    • Will we send someone up to open cabinets and doors for cooling?

  • Departure screen.  General knowledge plus how do we add instrument status to it if/when needed?

    • Is it change managed? (e.g. ECR)

  • Nighttime cameras (cloud and all sky).  How to troubleshoot and how to get access to raw and processed data.

  • Power strips. We’ve had Caleb come and talk to us about the power GUI, so that’s a good start on the remote power cycling abilities.

    • Troubleshooting procedures?

    • Are all outlet labels verified?

  • What are procedures for sending people to summit?

    • When invoked, we need to make sure those people (we’ll need 2 for safety) can easily and efficiently get a vehicle which is fueled up and ready.

  • Training on Alerton.

    • Is Alerton on sysadmin login plans? Will this change?

  • Fire alarm system basic training (including in RO). What to do if it is beeping?

Discussion

  • Is departure time still 4:20pm? Yes

  • John V has noted that power outage procedure is out of date for instruments

    • Can now do targeted shutdowns of instruments, so this is emoting we might take advantage of

  • Kyle: Do power outage procedure elements need to be integrated to AFP?

  • Percy: how do we get another PDU installed and configured for an instrument?

    • Ask Kyle or Caleb

  • Percy: what if instrument fails and is not recoverable? Do we have alternate engineering programs if PI has no science use for available instruments?

    • Similar to current situation, but don’t have step of NA troubleshooting

    • Randy: will need policies to decide when to send people up

  • Carolyn: training on lighting and Alerton?

    • They are intending to pull lighting out of Alerton

  • Event Notifier intended users: OAs and SAs and anyone else who wants to keep an eye on a system

    • EN has same reliance on keyword monitoring that keyword history does, so reliability will be the same

1:37

Instrument Look-ahead

Jim

  • One of the many roles Dwight filled was to see what was coming for the instrument suite and triage the efforts

  • Includes, what services are needed? Which instrument(s) will be on the pump? When to go cold/warm?

  • Propose that each SA take a monthly rotation to do the look ahead. Spreads the load and gives each of us the opportunity for overall view

  • e.g. we have 3 main vacuum pump stations, so we can’t pump all of KCWI and LRIS at the same time.

  • They are recruiting for a replacement for Dwight’s position

  • Josh: what about using KNIT meeting? Use first part of meeting for this.

  • Should we set up cryo and vacuum calendars?

  • Marc: should be coordinated with servicing missions

1:49

Instrument PM’s and E-Maint

Grant

  • Brief intro / start of Grant and SA’s learning E-Maint, configuring instrument PM’s

  • RaP project has half a dozen components/systems

  • Grant is “System Lead” for instruments

  • One task is to get instrument PMs going again

  • eMaint looks good for technicians, improvement over IPM for them. They have tablets on summit which sync when docked and have task lists and procedures.

  • For anyone trying to administer tasks or examine how progress is being made, it is not intuitive

    • e.g. not clear how many instrument tasks exist

  • Craig is local expert

  • System generates work order based on calendar, not based on time from last completion

    • Can be changed, but probably on a per task basis

  • Currently only sending work orders to Dennis, regardless of nature of the work order

  • SAs to look at eMaint and contact Grant if you want to try to add tasks for your instrument

  • Repair and Prepare resources allocations sheet https://keckhawaii.sharepoint.com/:x:/r/sites/Projects/RaP/Planning%20Documents/RaP%20Resources%20Rev%20B.xlsx?d=w402039847dd941e487446126e87c2137&csf=1&web=1&e=1dd3Oz

2:19

LRIS Split Nights

Jim

  • Config form overwrites

  • Recommend SA-led pre-observing meeting similar to how we used to do LGS

  •  

2:27

Pau!

 

 