Expectation on director search is that the new director should be named in the next few weeks. It is in the board’s hands. They’ve done their interviews.
Reminder to charge time to instrument maintenance when appropriate. Remind others to do the same (software, summit etc.).
Also charge to appropriate CI project when appropriate
Grant: summit staff should also use RaP project per instrument codes for certain tasks
Randy will be working on 24A support schedule toward end of Dec, so get support block out dates in.
1:10
UNO Documentation and Training Needs
Josh
Draft list from Josh:
VWA and cameras.
How do we access VWA cameras?
How do we troubleshoot?
A complete and detailed run down on the day crew’s departure criteria under the UNO scheme.
Event Notifier training
Should instruments be put in that?
A complete and detailed run down on the new OA procedures for safely handling remote ops and how it might affect night time operations.
Power outage procedures, so we can understand how they will affect instruments.
What happens when no one is on the summit?
When are things powered down? Who does it?
Will we send someone up to open cabinets and doors for cooling?
Departure screen. General knowledge plus how do we add instrument status to it if/when needed?
Is it change managed? (e.g. ECR)
Nighttime cameras (cloud and all sky). How to troubleshoot and how to get access to raw and processed data.
Power strips. We’ve had Caleb come and talk to us about the power GUI, so that’s a good start on the remote power cycling abilities.
Troubleshooting procedures?
Are all outlet labels verified?
What are procedures for sending people to summit?
When invoked, we need to make sure those people (we’ll need 2 for safety) can easily and efficiently get a vehicle which is fueled up and ready.
Training on Alerton.
Is Alerton on sysadmin login plans? Will this change?
Fire alarm system basic training (including in RO). What to do if it is beeping?
Discussion
Is departure time still 4:20pm? Yes
John V has noted that power outage procedure is out of date for instruments
Can now do targeted shutdowns of instruments, so this is emoting we might take advantage of
Kyle: Do power outage procedure elements need to be integrated to AFP?
Percy: how do we get another PDU installed and configured for an instrument?
Ask Kyle or Caleb
Percy: what if instrument fails and is not recoverable? Do we have alternate engineering programs if PI has no science use for available instruments?
Similar to current situation, but don’t have step of NA troubleshooting
Randy: will need policies to decide when to send people up
Carolyn: training on lighting and Alerton?
They are intending to pull lighting out of Alerton
Event Notifier intended users: OAs and SAs and anyone else who wants to keep an eye on a system
EN has same reliance on keyword monitoring that keyword history does, so reliability will be the same
1:37
Instrument Look-ahead
Jim
One of the many roles Dwight filled was to see what was coming for the instrument suite and triage the efforts
Includes, what services are needed? Which instrument(s) will be on the pump? When to go cold/warm?
Propose that each SA take a monthly rotation to do the look ahead. Spreads the load and gives each of us the opportunity for overall view
e.g. we have 3 main vacuum pump stations, so we can’t pump all of KCWI and LRIS at the same time.
They are recruiting for a replacement for Dwight’s position
Josh: what about using KNIT meeting? Use first part of meeting for this.
Should we set up cryo and vacuum calendars?
Marc: should be coordinated with servicing missions
1:49
Instrument PM’s and E-Maint
Grant
Brief intro / start of Grant and SA’s learning E-Maint, configuring instrument PM’s
RaP project has half a dozen components/systems
Grant is “System Lead” for instruments
One task is to get instrument PMs going again
eMaint looks good for technicians, improvement over IPM for them. They have tablets on summit which sync when docked and have task lists and procedures.
For anyone trying to administer tasks or examine how progress is being made, it is not intuitive
e.g. not clear how many instrument tasks exist
Craig is local expert
System generates work order based on calendar, not based on time from last completion
Can be changed, but probably on a per task basis
Currently only sending work orders to Dennis, regardless of nature of the work order
SAs to look at eMaint and contact Grant if you want to try to add tasks for your instrument