2024-03-14 Meeting notes

2024-03-14 Meeting notes

 Date

Mar 14, 2024

 Participants

  • @Randy Campbell @Michael Lundquist @Grant Hill @Josh Walawender @Rosalie McGurk @Jim Lyke @Marc Kassis @Carlos Alvarez

  • @Kyle Lanclos @Carolyn Jordan Max Service @Greg Doppmann @sherry yeh @Percy Gomez

 Goals

  •  

 Discussion topics

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

1:00

Words from Randy

Randy

  • Update on K1 pier repair:

    • Board approved reserve funding to proceed with plan

    • Repair rest of K1 pier in 2 installments (2 shutdowns) starting March-ish of next year (6.5 weeks each)

    • Probably March and Nov of 2025

    • Other work at same time?

      • Possible, but limitation on number of people at summit

    • Marc and Carolyn are to look at pier repair passing with DEIMOS and KCWI upgrades. Need K2 dark instrument.

    • Greg: replace cold head on OSIRIS? and maybe MOSFIRE?

      • Will be dust in dome, OSIRIS ok, but maybe not MOSFIRE

1:10

SSC

Marc

(in place of John)

  • From SSC

    • Complements on EQ handling from Mike

    • UNO: Req to add POC form for specific UNO feedback

    • Leadership is eager to have instrument suite evolution (ISE) committee. ISE mandate is to present to SSC in May

  • SCALES Update

    • Anticipate delivery in summer 2025

    • Andy will be on sabbatical here starting then

    • Isabel Kain will be here long term as well

    • Retire NIRSPAO when SCALES arrives

      • no NIRSPAO starting sometime in 25B

      • this proposal cycle is the last chance for this RA range (not advertised)

    • PyWFS retirement is endorsed

    • New ME (Ellie O’Brien) will be installing AO crane in K2

    • Liz is helping Matt B document what s/w changes are needed for a new instrument computer

      • This group should take a look, talk to Matt

    • Problems with tip tilt steering mirror (TTSM), returned to PI

    • Detector controller is new: MACI

      • Who is doing software for that? UCLA we think

    • What is cooldown and warmup time?

      • ~1.5 weeks

      • To cool down there is a LN2 pre-cool. If we don't use that, cool down will take longer.

    • Cold heads (2) will be 1050s similar to MOSFIRE

    • Who is Keck software rep?

      • Kyle for overall instrument interface

      • Some sharing with Matt

      • KL: have done very little from Keck side, haven’t seen anything

    • Who are SAs?

      • Has been Jim, but being reconsidered

      • No deputy yet, but Carlos has been involved

1:56

Chien-Hsiu Departure

Jim

  • Where are challenges?

    • Josh remains MOSFIRE primary, need deputy

    • MOSFIRE server upgrade

  • Support

    • Heavy K1

    • Jim moves that we don’t backfill ESI. Grant can do that if needed.

  • KOA Interface

    • Direct things to Jeff for now?

    • Do we plan to fill the KOA role from this group?

    • Maybe. Have always had (CHL, Luca, Hien)

  • Action on Jim to look at support coverage and send draft

    • Update Jim if block out dates need to be updated

2:27

Pau!

 

Next meeting lead: Josh

 Action items

 Decisions

Related content

2024-03-28 Meeting notes
2024-03-28 Meeting notes
More like this
2024-02-29 Meeting notes
2024-02-29 Meeting notes
Read with this
2024-02-01 Meeting notes
2024-02-01 Meeting notes
More like this
2024-04-25 Meeting notes
2024-04-25 Meeting notes
More like this
2022-06-23 Meeting notes
2022-06-23 Meeting notes
More like this
2021-03-11 Meeting notes
2021-03-11 Meeting notes
More like this