KPF Final Components - Inspection Reports
FIU
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
WMKO Drawings | FIU Optimax Final Reports (from Scott) - Part 1.zip FIU Optimax Final Reports (from Scott) - Part 2.zip FIU Optimax Final Reports (from Scott) - Part 3.zip FIU Optimax Final Reports (from Scott) - Part 4.zip FIU Optimax Final Reports (from Scott) - Part 5.zip | Zip file contents: |
Calcium HK Spectrometer
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
Scrambler
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
July 22, 2020 | None | Vacuum windows (and coatings): |
Echelle
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
May 24, 2018 |
Zerodur Mounts
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
April 13, 2021 | ||||
April 13, 2021 | ||||
July 9, 2021 |
Rough-Cut Zerodur Blanks
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
February 5, 2020 | Page one of: KPF-SPE-MEC-122 Reformatter Mount - Rev 03.PDF Drawing has since been superseded by Rev 04 | Inspection report.pdf | Two blanks were cut out of the Zerodur disk. | |
February 21, 2020 | Large slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches. | |||
February 25, 2020 | Page one of: | Blank cut out of the Zerodur disk. | ||
February 25, 2020 | KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDF | Blank cut out of the Zerodur disk. | ||
February 27, 2020 | KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDF | Blank cut out of the Zerodur disk. | ||
April 7, 2020 | Milling at AGI prior to shipping to Winlight |
Optic Substrates
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
June 21, 2021 | Primary Collimator | |||
Nov 20, 2020 | Secondary Collimator | EIDP- UCB Space Sciences Laboratory_PO-BB01364029 Rev 1-signed.pdf | ||
Sept 25, 2020 | Red Prism | |||
Sept 25, 2020 | Green Prism | |||
Sept 9, 2020 | Red Fold Mirror | |||
May 6, 2020 | Dichroic Substrate | SSL_Dichroic_Substrate_Inspection_051120.pptx
| ||
July 7, 2020 | Intermediate Fold Mirror |
Shims
Date | Final Quote | As-Built Drawing | Compliance/ | Notes |
|---|---|---|---|---|
3/16/2021 |