KPF Final Components - Inspection Reports
FIU
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
WMKO Drawings |
Calcium HK Spectrometer
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
KPF Approved Mechanical Drawings |
Scrambler
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
July 22, 2020 | None | Vacuum windows (and coatings): |
Echelle
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
May 24, 2018 | UC Berkeley Final Report_FINAL-1.pdf |
Zerodur Mounts
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
April 13, 2021 | KPF-SPE-MEC-201 Rev 04 Spectrometer Bench.PDF | Schott_Bench_Inspection_Report.pdf | ||
April 13, 2021 | KPF-SPE-MEC-142 Rev 01 Echelle Mounting Base.PDF | Schott_Echelle_Base_Inspection_Report.pdf | ||
July 9, 2021 | KPF-SPE-MEC-191 Rev 01 Camera Support Base.PDF | Schott_Camera_Mounts_Inspection_Report.pdf |
Rough-Cut Zerodur Blanks
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
February 5, 2020 | Page one of: KPF-SPE-MEC-122 Reformatter Mount - Rev 03.PDF Drawing has since been superseded by Rev 04 | Inspection report.pdf | Two blanks were cut out of the Zerodur disk. | |
February 21, 2020 | KPF-SPE-MEC-201B Rev 03 Zerodur Disk Cut Plan.PDF | UC BERKELEY SLICES.xlsx | Large slice inspections sheets. Decision made to move forward with TOP and MIDDLE slices as the primary and back-up benches. | |
February 25, 2020 | Page one of: | UC BERKELEY IFM.xls | Blank cut out of the Zerodur disk. | |
February 25, 2020 | KPF-SPE-MEC-162RB Rev 03 Secondary Collimator Optic Rough Cut Blank.PDF | UC BERKELEY SECONDARY COLLIMATOR.xls | Blank cut out of the Zerodur disk. | |
February 27, 2020 | KPF-SPE-MEC-132RB Rev 05 Primary Collimator Rough Cut Blank.PDF | UC BERKELEY PRIMARY COLLIMATOR.xls | Blank cut out of the Zerodur disk. | |
April 7, 2020 | KPF-SPE-MEC-122 Reformatter Mount - Rev04.PDF | KPF Reformatter Mount Inspection.pptx | Milling at AGI prior to shipping to Winlight |
Optic Substrates
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
June 21, 2021 | Primary Collimator | KPF-SPE-MEC-132B_KPF_Pri_Collimator_EIDP.pdf | ||
Nov 20, 2020 | Secondary Collimator | EIDP- UCB Space Sciences Laboratory_PO-BB01364029 Rev 1-signed.pdf | ||
Sept 25, 2020 | Red Prism | |||
Sept 25, 2020 | ||||
Sept 9, 2020 | Red Fold Mirror | |||
May 6, 2020 | Dichroic Substrate | SSL_Dichroic_Substrate_Inspection_051120.pptx
20021_01_KPF_SPE_MEC_172_REV03_001_EXIT_SIDE _Processed.dat 20021_01_KPF_SPE_MEC_172_REV03_001_EXIT_SIDE .DAT
20021_01_KPF_SPE_MEC_172_REV03_001_TWF _Processed.dat 20021_01_KPF_SPE_MEC_172_REV03_001_TWF .DAT | ||
July 7, 2020 | Intermediate Fold Mirror |
Shims
Date | Final Quote | As-Built Drawing | Compliance/ Certification Docs | Notes |
---|---|---|---|---|
3/16/2021 |
, multiple selections available,