2024-02-15 Meeting notes

2024-02-15 Meeting notes

 Date

Feb 15, 2024

 Participants

  • @Josh Walawender@Rosalie McGurk @Greg Doppmann @Randy Campbell @Percy Gomez @Michael Lundquist @Chien-Hsiu Lee (Unlicensed) @sherry yeh @Jim Lyke @John O'Meara @Carlos Alvarez Max Service

  • @Kyle Lanclos @Carolyn Jordan

 Goals

  •  

 Discussion topics

Time

Item

Presenter

Notes

Time

Item

Presenter

Notes

1:02

Words from Randy

Randy

  • Update on semi-retirement starting sometime in March

    • Will stay on night support until we can get someone hired and trained

    • FY25 budget will be tight

    • Hire will be at SA I level? Open to more senior person

  • AO Ops situation

    • Jim will be taking over for Randy

    • Probably will change how AO ops will work

    • New structure in AO dev team with Peter’s retirement

    • Antonin interested in working more closely with us in ops

    • Probably still want to ID an SA lead for AO ops

    • JO: Antonin will report to John, that’s a change. More linking between ops and dev at that level

    • JO: more transition linkage between proposals and ops at John O’Meara level

1:18

Words from John

John

  • In Multi year planning

    • Doing 5 year outlook, last one was under previous leadership

    • Anticipates annual planning and project planning will “look different”

  • Randy: pier repair planning 6.5 week shutdown in March/April of 2025

    • Full repair will take 2 of these 6.5 week shutdowns

    • Next gating is availability call in late-July/early-Aug

1:24

UNO phase I

Carolyn

UNO phase one starting next week (Feb 21)

  • Reviewed criteria to enter phase 1 yesterday

  • OAs will work as if they are not at the summit

  • OAs will need time at beginning of night to do checks with cameras in dome

    • Needs lights

    • Conflicts with afternoon cals

    • Strategy: Ask observers to be on Zoom. They will get their cals interrupted if they are not on Zoom

    • Sherry has GUI to toggle domecals keyword

1:47

Feedbacks on KOA services

Chien-Hsiu

Gathering user experience and feedback of KOA page and ODAP. Feedback will be presented during KOA F2F meeting (3/11-12)

  • Talk to CHL if you have questions. Have done tutorial in past meeting.

  • RC: statistics on use?

    • Something like 200 people have visited the page

  • CA: user friction is still figuring out how to add access, often happens during observations when KOA is not available

  • Long term solution is to link KOA accounts and Keck observer accounts

  • Alternatively could run RTUI from here

  • Also working to get KOA links in observer login page

  • JL: Are we planning to change user access to data disks or other access changes?

    • JO: not aware of impending changes

  • RM, CA: RTUI only provides current data, don’t provide data already taken

    • CHL: submit KOA ticket

  • Possibly send KOA reminder to Co-Is in remote observing reminders to observers

2:01

DSI / NIRES

Michael

update on DSI work with NIRES

  • Engineering night about a month and a half ago

  • Went well as far as configuring telescope and commanding telescope nods

  • Some issues with parallelization

    • e.g. slit viewing camera not running concurrently with spectrograph exposures

  • Working on ability to skip around in a sequence

    • e.g. resume after a problem partway through a sequence

    • Max working on way to jump to a particular point in sequence

  • RC: what does it look like? How do you know where you are?

    • ML: not enough feedback, have existing NIRES GUIs

    • Logs have too much info

  • Possible use on a Percy science night later this month

2:15

Dome Update

Jim

  • K2 dome update

    • 2 dome drives coming

    • scheduled for afternoon delivery tomorrow

    • JL: this is kind of an UNO dry run, will they install immediately? Influenced by forecast?

    • Previous spare works for 1.5 nights, but did not have cooling fams

  • Next week K1 instrument glycol valve replacement

    • Will be down during the day

    • Is RTC engineering night

    • CCRs will be up, compressors are on facility glycol

  • Breaker work on Feb 28 will not be going forward on that day

2:22

NIRSPEC Service

Greg

  • Pump out water yearly

  • Decided to also put new filter in this year and some inspections

  • EQ hit 45 minutes before craning, so that day was cancelled for EQ inspections

  • Next day K2 dome drive failed, so unable to crane

  • Replaced cold heads

    • Previously had been done by Dwight

    • Some pain in procedure

    • Both John and Dennis got experience

2:30

KVSP

Randy and Josh

Keck Visiting Scholar Program

  • Applications due March 1

2:31

Interns

Randy

  • Also U Chicago has Metcalfe intern program

    • Had one here last year

  • Available

  • If you have project for summer intern this is open

  • Undergrad at Jr/Sr level

  • Have new astrophysics major, but also have software engineers and others who can apply

  • We give them job descriptions and they do applications and selection

2:35

Pau!

 

Next meeting lead: @Greg Doppmann

 Action items

 Decisions

Related content

2024-02-01 Meeting notes
2024-02-01 Meeting notes
More like this
Calendar year 2024
Calendar year 2024
Read with this
2023-12-21 Meeting notes
2023-12-21 Meeting notes
More like this
2022-02-03 Meeting notes
2022-02-03 Meeting notes
More like this
2024-08-01 Meeting notes
2024-08-01 Meeting notes
More like this
2023-04-27 Meeting notes
2023-04-27 Meeting notes
More like this