1:02 | Words from Jim Words from Greg | Jim Greg | |
1:03 | Words from John | John | SSC and NIKUG meetings upcoming Both coming to HQ Sent notional schedule to Jim, will send to SA slack Instrument updates: “if there’s not much to say, don’t say much” Carolyn to ID an OA to present something As usual, NIKUG presentations will be shorter SSC is 5th, NIKUG is 15th
FY25 planning is largely complete Off island next week with Rich meeting with Bruce and Chris at UCSC Will be lots of spirited debate around NIRES retirement For SSC and NIKUG: highlight operational pressures on observatory Will hopefully get permission to submit PyWFS probably to WFS KASM/GEO proposal also likely to be submitted Still waiting on news about Liger funding Team Keck time: will look at proposals soon Got contribution for KVSP
|
1:18 | upcoming SSC instrument reports on Nov 5? | Josh | Michael: LRIS + DEIMOS Carlos: NIRC2 Greg: NIRSPEC + HIRES + KCWI Josh: MOSFIRE + KPF Sherry: HIRES + OSIRIS Percy: AO (Max for NIKUG) + NIRES Jim: ESI Dry run in 2 weeks? on Oct 24 meeting
|
1:26 | AO update | Percy | K1 rotator had issues Also found loose weights, not properly secured K2 is working reasonably well GD: How often should RTC be rebooted? No need to reboot preemptively at start of cals MS: Only do during troubleshooting, not preemptively
Percy will try to make a web page with recent issues (instead of big spreadsheet of tickets maintained by team) Have been some false alarms for laser closure. Treat all alarms as real for now. Check that tip tilt star is within allowed range, observers have gotten this wrong on star list. Check when processing list.
|
1:34 | UNO ATS procedures | Percy | All Lakeshores on UPS? All heaters on UPS? Procedures to recover with and without servers back Order for recovering the servers? UNO instrument readiness, particularly whether the project has met the instrument temperature monitoring requirement. Team wants procedures to follow from us We have the possibility to have things on UPS Every instrument scientist to provide recovery procedure for two cases: If server is back online If server is not online And a procedure/checklist for before power is out Is there an order for servers to come back on? Does the instrument server bring up all daemons?
|
2:05 | UNO Instrument Alarms | Carolyn | Do we get instrument (e.g. temperature) alarms in time to do something about it in an UNO world where it takes 2 or more hours to get someone to summit. Event Notifier is dead/on life support Carolyn is ok to mark this as a requirement not met and needs a replan Will be policy to have someone (minimum 2) on call to drive up When is UNO coming? Unclear. Electrical work on 6th is necessary step Will then enable AFP testing Then could move to Phase 2 AFP testing will be at night on both telescopes (simulate power outage)
|
2:22 | Pau! | | Next lead: Carlos |